Project details
| Official title | Indipur Laterite Stone Quarry Over an Area of 3.05acres Or 1.234 Ha (Total Cluster Area- 3.536ha.) Is Located in Village Indipur Under Odapada Tahasil of Dhenkanal District, Odisha. |
|---|---|
| Status | Not approved |
| Status since | 31 Aug 2026 |
| Application filed | 22 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ranjan Pattanaik |
| Land area | 3 acres (1.2 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Indipur |
| Taluk / tehsil | Dhenkanal Sadar |
| District | Dhenkanal |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-02763 |
In context
125 applications in Dhenkanal since January 2022 are in the same category (Mining): 75 approved, 9 filed or under review, and 41 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3 acres, this one is smaller than 87% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 8.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.
Where it is
Indipur, Dhenkanal Sadar, Dhenkanal, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Gundurapasi Laterite Stone Quarry No- II — environmental approval granted, 100 m away
- Gundurapasi Laterite Stone Quarry- 1 over an area of 9.16 Acre or 3.16Ha under… — environmental approval granted, 750 m away
- Balarampur Laterite Stone Quarry Over an Area of 1.00 Acre Or 0.404 Ha. Is… — not approved, 4.9 km away
- 20% Enhancement of Existing Unit With No Increase in Pollution Load — initial checks, 6.9 km away
- Proposed Grain Based Distillary unit (100 KLPD) with Co-generating Power plant… — environmental approval granted, 7.5 km away
- Proposed for change in production capacity from 100 KLPD Ethanol and ENA… — initial checks, 7.6 km away
- Laying of Iocl's 2 Pipelines of 10.754 Km Long 8.625" Od X 0.25" Wt Each for… — more information requested, 8.7 km away
- For obtaining Forest Clearance for setting up Integrated Advanced Specialty… — in-principle approval, conditions pending, 9.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.