Project details
| Status | In-principle approval, conditions pending |
|---|---|
| Status since | 16 Nov 2026 |
| Application filed | 24 Mar 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Industry |
| Applicant | Kalyani Steels LTD |
| Land area | 2,265.2 acres (916.7 ha) |
| Forest land | 146.3 acres (59.2 ha) |
| Project cost | ₹11,058 crore |
| Village / locality | Talabarakot |
| Taluk / tehsil | Dhenkanal Sadar |
| District | Dhenkanal |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04529 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 24 Mar 2025 (this page) | In-principle approval, conditions pending | 2,265.2 acres | ₹11,058 crore |
| New project filed 6 Sept 2024 | Not approved | 555.3 acres | ₹11,058 crore |
In context
36 applications in Dhenkanal since January 2022 are in the same category (Industry): 8 approved, 18 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 2,265.2 acres, this one is larger than 72% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Talabarakot, Dhenkanal Sadar, Dhenkanal, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- KATAKAMADA ROAD METAL QUARRY No- 02 Over an area of 8.50 Acres 3.439 hect — not approved, 2.8 km away
- Katakamada Road Metal Quarry No- 02 over an area of 8.50 Acre or 3.439 Ha… — not approved, 2.8 km away
- Katakamada Road Metal Quarry No- 02 over an area of 8.50 Acre or 3.439 Ha… — environmental approval granted, 2.8 km away
- 1.43 MTPA Greenfield Integrated Advanced Specialty Steel Plant — under environmental review, 2.9 km away
- 1.43 MTPA Greenfield Integrated Advanced Specialty Steel Plant — cleared for impact study, 2.9 km away
- 1.43 MTPA Greenfield Integrated Advanced Specialty Steel Plant — returned to applicant, 2.9 km away
- 20% Enhancement of Existing Unit With No Increase in Pollution Load — initial checks, 5.7 km away
- Nochapali Laterite Stone Quarry Over an Area of 1.16acres Or 0.47 Ha Is — environmental approval granted, 5.9 km away
More from Kalyani Steels LTD in Dhenkanal
- 1.43 MTPA Greenfield Integrated Advanced Specialty Steel Plant — under environmental review
- 1.43 MTPA Greenfield Integrated Advanced Specialty Steel Plant — cleared for impact study
- 1.43 MTPA Greenfield Integrated Advanced Specialty Steel Plant — returned to applicant
All 5 Kalyani Steels projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.