One of 2 filings for this project. The project's main page, with every filing and where each stands: Greenfield Integrated Steel Plant of capacity 13.2 MTPA Crude Steel with 10 MTPA Cement…
Project details
| Official title | Setting up of a Greenfield Integrated Steel Plant of capacity 13.2 MTPA Crude Steel with 10 MTPA Cement Grinding Unit and 900 MW Captive Power Plant near Paradeep, Jagatsinghpur district, Odisha |
|---|---|
| Status | More information requested |
| Status since | 18 Sept 2026 |
| Application filed | 10 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Jsw Utkal Steel Limited |
| Land area | 18,662.1 acres (7,552.3 ha) |
| Project cost | ₹65,000 crore |
| District | Other |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-02956 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Nov 2025 | Under coastal review | 18,662.1 acres | ₹65,000 crore |
| Amendment filed 10 Mar 2025 (this page) | More information requested | 18,662.1 acres | ₹65,000 crore |
Where it is
Other, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield Integrated Steel Plant of capacity 13.2 MTPA Crude Steel with 10… — under coastal review, 0 m away
- Revision and Expansion of Residential-cum-Commercial with Multiplex Building… — environmental approval granted, 84.1 km away
- Integrated Anandapur Barrage Project — environmental approval granted, 90.8 km away
- Affordable Residential Apartment Project by M/s Sri Jagannath Promoters &… — environmental approval granted, 93.7 km away
- Proposed Intake Water Pipe Line Corridor for Ttps Expansion Project (2 X… — not approved, 148.5 km away
- "Proposed Integrated Carbon Complex having 1. Coal Tar Distillation (CTD) Unit… — returned to applicant, 302.6 km away
- Proposed Alumina Refinery of 3.0 MTPA — cleared for impact study, 399.1 km away
All 10 Jsw Utkal Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.