Quick answers
What is this project?
Submission of application for Extension validity of EC for 1X120 MW Coal Based Thermal Power Plant at/ Village- Ramachandrapur, Tahasil- Chatrapur, District- Ganjam, Odisha of M/s Rama Krishna Prasad Power Private Limited is a proposed power project in Shriramachandrapur, Chamakhandi, Ganjam, Odisha. The site covers 87.7 acres.
Who is building it?
The applicant is Dr Rama Krishna Prasad Power Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Shriramachandrapur, Chamakhandi, Ganjam, Odisha.
How big is it?
It has a stated cost of ₹700 crore and a site of 87.7 acres.
When was it filed?
The application was filed on 6 Aug 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 29 Aug 2026 |
| Application filed | 6 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Power |
| Applicant | Dr Rama Krishna Prasad Power Private Limited |
| Land area | 87.7 acres (35.5 ha) |
| Project cost | ₹700 crore |
| Village / locality | Shriramachandrapur |
| Taluk / tehsil | Chamakhandi |
| District | Ganjam |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-03790 |
In context
16 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Shriramachandrapur, Chamakhandi, Ganjam, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Application for validity extension of EC for production of 2.532 KLD Mahua… — environmental approval granted, 2.1 km away
- Application for validity extension of EC for production of 2.532 KLD Mahua… — environmental approval granted, 2.1 km away
- Application for extension of EC for production of 2.532 KLD Mahua Flower based… — environmental approval granted, 2.1 km away
- Shore Protection Measures Along the Aryapalli Coastline at Northern Side of… — lapsed, 3.8 km away
- Proposed Tires Manufacturing Unit at Plot No. DLCT- 04, Gopalpur Industrial… — returned to applicant, 4.1 km away
- Transfer of Crz Clearance From M/S Mahadhan Agritech Limited to M/S Deepak… — coastal clearance granted, 4.3 km away
- Transfer of Crz Clearance From M/S Smartchem Technologies Limited to M/S… — coastal clearance granted, 4.3 km away
- Change in the Approved Land Use Plan of 3.160 Ha Forest Land in Berhampur… — lapsed, 4.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.