What is Pipalapanka Dam Project?
Pipalapanka Dam Project is a lapsed water and irrigation project in Pipalapanka, Surada, Ganjam, Odisha. The site covers 34.8 acres.
Who is building it?
The applicant is Superintending Engineer, Ganjam Investigation Division (DoWR.Odisha).
Has it been approved?
No. The application was lapsed on 31 Oct 2026, so it is no longer under consideration.
Where is it?
In Pipalapanka, Surada, Ganjam, Odisha.
How big is it?
It has a stated cost of ₹1,013 crore and a site of 34.8 acres.
When was it filed?
The application was filed on 26 May 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 31 Oct 2026 |
| Application filed | 26 May 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Superintending Engineer, Ganjam Investigation Division (DoWR.Odisha) |
| Land area | 34.8 acres (14.1 ha) |
| Project cost | ₹1,013 crore |
| Village / locality | Pipalapanka |
| Taluk / tehsil | Surada |
| District | Ganjam |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-03888 |
In context
6 applications in Ganjam since January 2022 are in the same category (Water & irrigation): 0 approved, 2 filed or under review, and 4 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pipalapanka, Surada, Ganjam, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Pipalpanka Dam Project — under forest review, 2.6 km away
- Application for Extension of validity of 0.636 KLD mahua flower based country… — environmental approval granted, 7.9 km away
- Gopalpursasan Sand Quarry over an area of 12.344 Acres or 4.996 Hectares… — environmental approval granted, 15.6 km away
- Gopalpursasan Sand Quarry over an area of 12.344 Acres or 4.996 Hectares… — environmental approval granted, 15.7 km away
- Extension of validity of EC for Production of 2.064 KLD Mahua Flower Based… — not approved, 17.6 km away
- Extension of validity of EC for Production of 2.064 KLD Mahua Flower Based… — not approved, 17.6 km away
- Extension of validity of EC for Production of 2.064 KLD Mahua Flower Based… — environmental approval granted, 17.6 km away
- Extension of validity of EC for Production of 2.064 KLD Mahua Flower Based… — environmental approval granted, 17.6 km away
More from Superintending Engineer, Ganjam Investigation Division (DoWR.Odisha) in Ganjam
- Pipalpanka Dam Project — under forest review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.