Quick answers
What is Pipalpanka Dam Project?
Pipalpanka Dam Project is a proposed water and irrigation project in Forest, Surada, Ganjam, Odisha. The site covers 2,723.9 acres.
Who is building it?
The applicant is Superintending Engineer, Ganjam Investigation Division (DoWR.Odisha).
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Forest, Surada, Ganjam, Odisha.
How big is it?
It has a stated cost of ₹1,013 crore; a site of 2,723.9 acres and 2,543.7 acres (1,029.4 ha) of forest land.
When was it filed?
The application was filed on 3 Aug 2026.
Project details
| Status | Under forest review |
|---|---|
| Status since | 27 Nov 2026 |
| Application filed | 3 Aug 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Superintending Engineer, Ganjam Investigation Division (DoWR.Odisha) |
| Land area | 2,723.9 acres (1,102.3 ha) |
| Forest land | 2,543.7 acres (1,029.4 ha) |
| Project cost | ₹1,013 crore |
| Village / locality | Forest |
| Taluk / tehsil | Surada |
| District | Ganjam |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04175 |
In context
6 applications in Ganjam since January 2022 are in the same category (Water & irrigation): 0 approved, 2 filed or under review, and 4 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Forest, Surada, Ganjam, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Pipalapanka Dam Project — lapsed, 2.6 km away
- Application for Extension of validity of 0.636 KLD mahua flower based country… — environmental approval granted, 10 km away
- Road From Keruabadi to Adipanga Via Badepanga Under Inter District Inter Block… — lapsed, 15.8 km away
- Gopalpursasan Sand Quarry over an area of 12.344 Acres or 4.996 Hectares… — environmental approval granted, 17.8 km away
- Gopalpursasan Sand Quarry over an area of 12.344 Acres or 4.996 Hectares… — environmental approval granted, 17.8 km away
- Road from Adipanga to Rusimala via Hatimunda under Connecting Missing Road… — lapsed, 18.4 km away
- Extension of validity of EC for Production of 2.064 KLD Mahua Flower Based… — not approved, 19.8 km away
- Extension of validity of EC for Production of 2.064 KLD Mahua Flower Based… — not approved, 19.8 km away
More from Superintending Engineer, Ganjam Investigation Division (DoWR.Odisha) in Ganjam
- Pipalapanka Dam Project — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.