Quick answers
What is Approach Road for Utkal D&E?
Approach Road for Utkal D&E is an approved road project in Forest, Jarapada, Anugul, Odisha. The site covers 0.9 acres.
Who is building it?
The applicant is Nalco.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 28 Nov 2023), as of 27 Nov 2026.
Where is it?
In Forest, Jarapada, Anugul, Odisha.
How big is it?
It has a stated cost of ₹20 lakh; a site of 0.9 acres and 3,770 m² of forest land.
When was it filed?
The application was filed on 20 Mar 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 28 Nov 2023 |
| Application filed | 20 Mar 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Nalco |
| Land area | 3,800 m² |
| Forest land | 3,770 m² |
| Project cost | ₹20 lakh |
| Village / locality | Forest |
| Taluk / tehsil | Jarapada |
| District | Anugul |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04035 |
In context
5 applications in Anugul since January 2022 are in the same category (Roads & highways): 1 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected.
17 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Forest, Jarapada, Anugul, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Utkal C coal mine (ML area: 575.071 ha) — under environmental review, 2.4 km away
- Change in Name of User Agency From M/S Jindal Steel & Power Limited to M/S… — initial checks, 2.4 km away
- Utkal C coal mine (ML area: 575.071 ha) — returned to applicant, 2.4 km away
- Utkal C Opencast Coal Mine (3.37 Mtpa) in Ml Area of 575.07 Ha Located at… — environmental approval granted, 2.4 km away
- Diversion of 13.0 Ha Forest Land Out of Total 312.697 Ha of Utkal D & E Combined — forest land use approved, 2.6 km away
- Re-Diversion of 299.697 Ha Forest Land Out of Total 312.697 Ha of Utkal D & E… — forest land use approved, 3 km away
- Utkal D & Utkal E Coal Block (ML Area 824.316 ha) — under environmental review, 3 km away
- Modification in existing ECs of Utkal D Coal Block (ML Area 301.28 ha with… — environmental approval granted, 3 km away
More from Nalco in Anugul
- Utkal D & Utkal E Coal Block (ML Area 824.316 ha) — under environmental review
- Expansion of Aluminium Smelter Plant production capacity from 4.6 LTPA to 9.57… — lapsed
- Proposed Expansion of the Existing 1,200 MW (10x120 MW) to 2,280 MW (Addition… — under environmental review
- Proposed Expansion of the Existing 1,200 MW (10x120 MW) Sub-critical Captive… — returned to applicant
- Modification in existing ECs of Utkal D Coal Block (ML Area 301.28 ha with… — environmental approval granted
- Modification in existing ECs of Utkal D Coal Block (ML Area 301.28 ha with… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.