Quick answers
What is this project?
Proposed Expansion of the Existing 1,200 MW (10x120 MW) Sub-critical Captive Power Plant to 2,280 MW (Addition of 4 × 270 MW Units) at Angul, Odisha by National Aluminium Company Limited (NALCO) is a proposed power project in Gotamara, Banarpal, Anugul, Odisha. The site covers 920.3 acres.
Who is building it?
The applicant is Nalco.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Gotamara, Banarpal, Anugul, Odisha.
How big is it?
It has a stated cost of ₹12,860.5 crore and a site of 920.3 acres.
When was it filed?
The application was filed on 13 Feb 2026.
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 10 Mar 2026 |
| Application filed | 13 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Power |
| Applicant | Nalco |
| Land area | 920.3 acres (372.4 ha) |
| Project cost | ₹12,860.5 crore |
| Village / locality | Gotamara |
| Taluk / tehsil | Banarpal |
| District | Anugul |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-03891 |
In context
17 applications in Anugul since January 2022 are in the same category (Power): 7 approved, 9 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 920.3 acres, this one is smaller than 56% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gotamara, Banarpal, Anugul, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of the Existing 1,200 MW (10x120 MW) to 2,280 MW (Addition… — under environmental review, 2.3 km away
- Proposed Industrial Building having total built up area 28662.77 Sqm over… — environmental approval granted, 3.4 km away
- Environmental Clearance for Production of country Liquor from the… — environmental approval granted, 3.8 km away
- Expansion of Aluminium Smelter Plant production capacity from 4.6 LTPA to 9.57… — lapsed, 4.5 km away
- Expansion of Aluminium Smelter Plant production capacity from 4.6 LTPA to 9.57… — cleared for impact study, 4.5 km away
- 2x660 MW (Stage-III, Expansion) Coal based Ultra Super Critical Talcher… — environmental approval granted, 6.3 km away
- Expansion of Talcher Thermal Power Project from existing 1320 MW (Stage-III:… — under environmental review, 7.4 km away
- Diversion of forest land for Construction of 220KV LILO line from Existing LOC… — initial checks, 7.5 km away
More from Nalco in Anugul
- Utkal D & Utkal E Coal Block (ML Area 824.316 ha) — under environmental review
- Expansion of Aluminium Smelter Plant production capacity from 4.6 LTPA to 9.57… — lapsed
- Proposed Expansion of the Existing 1,200 MW (10x120 MW) to 2,280 MW (Addition… — under environmental review
- Modification in existing ECs of Utkal D Coal Block (ML Area 301.28 ha with… — environmental approval granted
- Modification in existing ECs of Utkal D Coal Block (ML Area 301.28 ha with… — environmental approval granted
- Transfer of EC Letter No J-11015/31/2007-IA.II (M) dated 10.12.2009 granted by… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.