Quick answers
What is this project?
Diversion of Balance Forest Land Over 422.048 Ha Including Safety Zone Over 15.374 Ha Within the Mining Lease Area of Khondbond Iron & Mn Mine is a lapsed mining project in Baitarani Reserved Forest, Joda, Kendujhar, Odisha. The site covers 3,282.3 acres.
Who is building it?
The applicant is Tata Steel Limited.
Has it been approved?
No. The application was lapsed on 24 Aug 2026, so it is no longer under consideration.
Where is it?
In Baitarani Reserved Forest, Joda, Kendujhar, Odisha.
How big is it?
It has a stated cost of ₹809.2 crore; a site of 3,282.3 acres and 1,042.9 acres (422 ha) of forest land.
When was it filed?
The application was filed on 29 Apr 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 24 Aug 2026 |
| Application filed | 29 Apr 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Mining |
| Applicant | Tata Steel Limited |
| Land area | 3,282.3 acres (1,328.3 ha) |
| Forest land | 1,042.9 acres (422 ha) |
| Project cost | ₹809.2 crore |
| Village / locality | Baitarani Reserved Forest |
| Taluk / tehsil | Joda |
| District | Kendujhar |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04084 |
In context
213 applications in Kendujhar since January 2022 are in the same category (Mining): 110 approved, 46 filed or under review, and 57 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3,282.3 acres, this one is larger than 95% of them.
No other mining lease on record is within 500 m of this site; 13 have applied within 5 km.
Where it is
Baitarani Reserved Forest, Joda, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion Proposal for Seeking Prior Approval Under Section 2 of Van… — lapsed, 0 m away
- Diversion of Balance Forest Land over 421.997ha including safety zone over… — more information requested, 0 m away
- Khondbond Iron & Mn Mine of M/s Tata Steel Ltd. — lapsed, 800 m away
- Mining project by Khandabandh Iron Mines, Sree Metaliks Ltd — forest land use approved, 1.9 km away
- Khandbandh Iron Ore Mines (35.774 Ha) of M/s Sree Metaliks Ltd — environmental approval granted, 1.9 km away
- Khandbandh Iron Ore Mines (35.774 Ha) of M/s Sree Metaliks Ltd — environmental approval granted, 1.9 km away
- Expansion of Iron Ore Production Capacity From 0.328 Million Tpa to 0.995… — environmental approval granted, 2.6 km away
- Expansion of Iron Ore Production Capacity From 0.328 Million Tpa to 0.995… — cleared for impact study, 2.6 km away
More from Tata Steel Limited in Kendujhar
- Amendment in Environmental Clearance granted to Joda East Iron Mine of Tata… — under environmental review
- Enhancement in production capacity of Manganese Ore from 0.832 LTPA (0.978… — under environmental review
- Enhancement in production capacity of Manganese Ore from 0.832 LTPA (0.978… — under environmental review
- Ratification of existing EC from EIA, 1994 to 2006 regime and Production… — under environmental review
- Diversion Over 16.574 Ha of Forest Land As Per Sabik Records (As on… — more information requested
- Proposed Environment Clearance for Residential Project at Mouza – Bileipada,… — lapsed
27 Tata Steel projects in Kendujhar
All 104 Tata Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.