Quick answers
What is this project?
Slurry, Return Water & Make Up Water Pipeline for 14 Mtpa Integrated Pellet Plant in the State of Odisha is a lapsed pipeline project in Jhumpura, Kendujhar, Odisha. The site covers 103 acres.
Who is building it?
The applicant is Essar Minmet Limited.
Has it been approved?
No. The application was lapsed on 20 Nov 2026, so it is no longer under consideration.
Where is it?
In Jhumpura, Kendujhar, Odisha.
How big is it?
It has a stated cost of ₹1,332 crore; a site of 103 acres and 11 acres (4.4 ha) of forest land.
When was it filed?
The application was filed on 20 Sept 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 20 Nov 2026 |
| Application filed | 20 Sept 2023 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Pipelines |
| Applicant | Essar Minmet Limited |
| Land area | 103 acres (41.7 ha) |
| Forest land | 11 acres (4.4 ha) |
| Project cost | ₹1,332 crore |
| Village / locality | Jhumpura |
| Taluk / tehsil | Jhumpura |
| District | Kendujhar |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04440 |
In context
11 applications in Kendujhar since January 2022 are in the same category (Pipelines): 1 approved, 3 filed or under review, and 7 withdrawn, lapsed or rejected. At 103 acres, this one is larger than 82% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jhumpura, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Application for Amendment EC for Remal Sand Bed, Khailo over an area of 12.50… — lapsed, 1.9 km away
- Remal River Sand Bed, Kathapal to Daradipal Over an Area of 12.50 Acres Or… — environmental approval granted, 1.9 km away
- Remal Sand Bed — environmental approval granted, 1.9 km away
- Submission of Replenishment Study Report of Kusei Sand Bed, Deogaon over an… — not approved, 4.2 km away
- Remal Sand Bed mining — environmental approval granted, 5.4 km away
- Environmental Clearance in Respect of Bholanuagaon Stone Quarry Over an Area… — environmental approval granted, 8.8 km away
- Environmental Clearance in Respect of Ostapura Stone Quarry Over an Area of… — environmental approval granted, 9 km away
- Transfer of ToR in favour of Sri Rakesh Kumar Nayak, S/o-Late Banshidhar Nayak… — cleared for impact study, 10.2 km away
More from Essar Minmet Limited in Kendujhar
- EIA for setting up of 14.3 MTPA Iron Ore Beneficiation Plant at Tikarpada &… — environmental approval granted
- EIA for setting up of 14.3 MTPA Iron Ore Beneficiation Plant at Tikarpada &… — not approved
- EIA for setting up of 14.3 MTPA Iron Ore Beneficiation Plant at Tikarpada &… — withdrawn
- EIA Studies for setting up of 14.3 MTPA Iron Ore Beneficiation Plant at… — lapsed
All 5 Essar Minmet projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.