Quick answers
What is this project?
EIA for setting up of 14.3 MTPA Iron Ore Beneficiation Plant at Tikarpada & Kadagarh Villages, Kendujhar district, Odisha is an approved mining project in Tikr>Pada, Kendujhar Sadar, Kendujhar, Odisha. The site covers 195.3 acres.
Who is building it?
The applicant is Essar Minmet Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 9 Sept 2025), as of 27 Nov 2026.
Where is it?
In Tikr>Pada, Kendujhar Sadar, Kendujhar, Odisha.
How big is it?
It has a stated cost of ₹1,918 crore and a site of 195.3 acres.
When was it filed?
The application was filed on 5 Aug 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 9 Sept 2025 |
| Application filed | 5 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Essar Minmet Limited |
| Land area | 195.3 acres (79 ha) |
| Project cost | ₹1,918 crore |
| Village / locality | Tikr>Pada |
| Taluk / tehsil | Kendujhar Sadar |
| District | Kendujhar |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-02981 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 Aug 2025 (this page) | Environmental approval granted | 195.3 acres | ₹1,918 crore |
| New project filed 28 Mar 2025 | Not approved | 275.3 acres | ₹1,918 crore |
In context
213 applications in Kendujhar since January 2022 are in the same category (Mining): 110 approved, 46 filed or under review, and 57 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 195.3 acres, this one is larger than 63% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Tikr>Pada, Kendujhar Sadar, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- EIA for setting up of 14.3 MTPA Iron Ore Beneficiation Plant at Tikarpada &… — not approved, 1.5 km away
- EIA for setting up of 14.3 MTPA Iron Ore Beneficiation Plant at Tikarpada &… — withdrawn, 1.5 km away
- Existing Iron Ore Beneficiation (1.0 MTPA throughput) and Iron Ore… — lapsed, 1.7 km away
- EIA Studies for setting up of 14.3 MTPA Iron Ore Beneficiation Plant at… — lapsed, 2.3 km away
- Seeking Permission of Forest Land for Non-Forest Use for Laying of Underground… — under forest review, 3.8 km away
- Seeking Permission of Forest Land for Non-Forest Use for Laying of Underground… — more information requested, 3.8 km away
- DIVERSION OF 0.399 Ha. SABIK FOREST LAND IN KEONJHAR FOREST DIVISION COMING… — lapsed, 4.5 km away
- Naibuga & Katupali Iron & Manganese Mines — initial checks, 4.5 km away
More from Essar Minmet Limited in Kendujhar
- EIA for setting up of 14.3 MTPA Iron Ore Beneficiation Plant at Tikarpada &… — withdrawn
- EIA Studies for setting up of 14.3 MTPA Iron Ore Beneficiation Plant at… — lapsed
- Slurry, Return Water & Make Up Water Pipeline for 14 Mtpa Integrated Pellet… — lapsed
All 5 Essar Minmet projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.