| Official title | Construction of 220 KV S/C transmission line on D/C tower from 220/33 KV GSS, Bonai to Taldihi Iron mine of SAIL, BIM, Tensa under Lahunipara & Koira Tahasil in Sundargarh District in the State of Odisha of M/s Odisha Power Transmission Corporation limited |
|---|---|
| Status | More information requested |
| Status since | 7 Sept 2026 |
| Application filed | 30 Jun 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Optcl |
| Land area | 351.7 acres (142.3 ha) |
| Forest land | 124.5 acres (50.4 ha) |
| Project cost | ₹70.8 crore |
| Village / locality | Juniyani |
| Taluk / tehsil | Lahunipara |
| District | Sundargarh |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04476 |
In context
13 applications in Sundargarh since January 2022 are in the same category (Power): 6 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 351.7 acres, this one is larger than 69% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Juniyani, Lahunipara, Sundargarh, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Forest Diversion Proposal of 13.932 HA against Railway Siding works of… — more information requested, 3.9 km away
- 33KV Transmission line from Bonaigarh sub-station to Despatch Area-2 of… — forest land use approved, 7.3 km away
- Greenfield Project For Installation Of Iron Ore Beneficiation Plant- 1.5 MTPA… — lapsed, 7.5 km away
- Greenfield Project For Installation Of Iron Ore Beneficiation Plant- 1.5 MTPA… — environmental approval granted, 7.5 km away
- Water Pipeline Project which includes Water intake system and Underground… — more information requested, 8.4 km away
- 33KV Power Transmission Line From K-Balanga Pss Grid 33/11KV Electrical… — forest land use approved, 10.1 km away
- Ec Grant of Baliatota Sand Bed Over an Area 5.00 Ac Or 2.023 Ha — more information requested, 11 km away
- Obtaining EC of Thelakudar Stone Quarry-1 over 10.00Acres or 4.05Hc — lapsed, 11.5 km away
More from Optcl in Sundargarh
- FDP For Construction of 220/33KV Grid Substation — not approved
- Rediversion of forest land of 2.672 ha For the Construction of 220 KV S/C… — in-principle approval, conditions pending
- 132 KV LILO Line from Loc No. 72 to 74 existing 132 KV Budhipadar- Sundargarh… — more information requested
- 132 KV D/C (4 Conductor) transmission line from 220/132/33 KV GSS, Bamra to… — lapsed
- 132 KV D/C (4 Conductor) transmission line from 220/132/33 KV GSS, Bamra to… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.