Quick answers
What is this project?
Expansion of existing Steel Manufacturing Unit namely M/s Radhika Steel Industries located at R.G. Mill Road, Mandi Gobindgarh, District Fatehgarh Sahib, Punjab for increasing the production capacity to 230 TPD (80,500 TPA) is an approved industrial project in Ajnali, Amloh, Fatehgarh Sahib, Punjab. The site covers 3.4 acres.
Who is building it?
The applicant is Suresh Kumar (Huf).
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 15 Mar 2024), as of 27 Nov 2026.
Where is it?
In Ajnali, Amloh, Fatehgarh Sahib, Punjab.
How big is it?
It has a stated cost of ₹22.2 crore and a site of 3.4 acres.
When was it filed?
The application was filed on 5 Jan 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 15 Mar 2024 |
| Application filed | 5 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Suresh Kumar (Huf) |
| Land area | 3.4 acres (1.4 ha) |
| Project cost | ₹22.2 crore |
| Village / locality | Ajnali |
| Taluk / tehsil | Amloh |
| District | Fatehgarh Sahib |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00038 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 Jan 2024 (this page) | Environmental approval granted | 3.4 acres | ₹22.2 crore |
| Early planning filed 23 Nov 2023 | Cleared for impact study | 3.4 acres | ₹22.2 crore |
In context
85 applications in Fatehgarh Sahib since January 2022 are in the same category (Industry): 70 approved, 3 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3.4 acres, this one is smaller than 76% of them.
78 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ajnali, Amloh, Fatehgarh Sahib, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of existing Steel Manufacturing Unit namely M/s Radhika Steel… — cleared for impact study, 0 m away
- Expansion of existing Steel Manufacturing Unit "M/s Sona Castings Pvt. Ltd."… — environmental approval granted, 700 m away
- Expansion of existing Steel Manufacturing Unit "M/s Sona Castings Pvt. Ltd."… — cleared for impact study, 700 m away
- Existing Steel Manufacturing Unit namely "Jogindra Castings Pvt. Ltd." located… — lapsed, 850 m away
- Amendment in the EC granted vide No. EC22B008PB110354 Dated 19.01.2022 by… — environmental approval granted, 1.1 km away
- Expansion of existing Steel Manufacturing Unit M/s Lord Mahaveer Industries… — environmental approval granted, 1.2 km away
- Permission for construction of approach Access to M/S PUNJAB FORGING… — forest land use approved, 1.3 km away
- Expansion in existing Steel manufacturing unit having capacity 29,400 TPA of… — environmental approval granted, 1.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.