Quick answers
What is this project?
Expansion in Environmental Clearance of Steel Manufacturing Unit namely "M/s Allied Recycling Limited" located at VPO Budhewal, Chandigarh Road, Tehsil Kum Kalan, District Ludhiana, Punjab for increase in production from 2,90,000 TPA (1,50,000 TPA of Steel Ingots/Billets and 1,40,000 TPA of Steel Wire Rods) to 3,52,450 TPA (1,78,500 TPA of Ingots/Billets and 1,73,950 TPA of Wire Rods) is an approved industrial project in Bhudhewal, Ludhiana (East), Ludhiana, Punjab. The site covers 5.2 acres.
Who is building it?
The applicant is Allied Recycling Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 20 Mar 2025), as of 27 Nov 2026.
Where is it?
In Bhudhewal, Ludhiana (East), Ludhiana, Punjab.
How big is it?
It has a stated cost of ₹67.1 crore and a site of 5.2 acres.
When was it filed?
The application was filed on 23 Sept 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 20 Mar 2025 |
| Application filed | 23 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Allied Recycling Limited |
| Land area | 5.2 acres (2.1 ha) |
| Project cost | ₹67.1 crore |
| Village / locality | Bhudhewal |
| Taluk / tehsil | Ludhiana (East) |
| District | Ludhiana |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00042 |
In context
98 applications in Ludhiana since January 2022 are in the same category (Industry): 56 approved, 14 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5.2 acres, this one is smaller than 56% of them.
30 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhudhewal, Ludhiana (East), Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion in existing steel manufacturing unit from existing capacity of… — environmental approval granted, 700 m away
- Application for issuance of Terms of Reference (TORs) for the existing unit… — lapsed, 750 m away
- Expansion in the existing steel manufacturing unit having existing capacity… — lapsed, 1 km away
- Expansion in the existing steel manufacturing unit having existing capacity… — cleared for impact study, 1 km away
- Expansion in the existing steel manufacturing unit having existing capacity… — cleared for impact study, 1 km away
- Expansion in existing Steel Manufacturing unit having existing capacity 26,950… — withdrawn, 1 km away
- Cross Walk — environmental approval granted, 2.7 km away
- Industrial project by Premia Chemicals Private Limited — lapsed, 2.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.