Quick answers
What is this project?
Expansion in existing steel manufacturing unit from existing capacity of 1,12,000 TPA (Hot Roll) of Steel Ingots/Billets/Rods and 45,000 TPA of Round, TMT Bars, wire rod, Flats and structural steel to 3,50,000 TPA of Steel Ingots/Billets/Rods (Hot Roll) and 3,40,000 TPA of Round, TMT Bars, wire rod, Flats and structural steel through re-heating by M/s Prime Steel Processors is an approved industrial project in Jandiali, Ludhiana (East), Ludhiana, Punjab. The site covers 12.2 acres.
Who is building it?
The applicant is M/S Prime Steel Processors.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 21 Jul 2023), as of 27 Nov 2026.
Where is it?
In Jandiali, Ludhiana (East), Ludhiana, Punjab.
How big is it?
It has a stated cost of ₹135 crore and a site of 12.2 acres.
When was it filed?
The application was filed on 20 Apr 2023.
Project details
| Official title | Expansion in existing steel manufacturing unit from existing capacity of 1,12,000 TPA (Hot Roll) of Steel Ingots/Billets/Rods and 45,000 TPA of Round, TMT Bars, wire rod, Flats and structural steel to 3,50,000 TPA of Steel Ingots/Billets/Rods (Hot Roll) and 3,40,000 TPA of Round, TMT Bars, wire rod, Flats and structural steel through re-heating at Village- Jandiali, Budhewal road, Tehsil – Kum Kalan, District- Ludhiana, Punjab, by M/s Prime Steel Processors . |
|---|---|
| Status | Environmental approval granted |
| Status since | 21 Jul 2023 |
| Application filed | 20 Apr 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | M/S Prime Steel Processors |
| Land area | 12.2 acres (5 ha) |
| Project cost | ₹135 crore |
| Village / locality | Jandiali |
| Taluk / tehsil | Ludhiana (East) |
| District | Ludhiana |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00218 |
In context
98 applications in Ludhiana since January 2022 are in the same category (Industry): 56 approved, 14 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 12.2 acres, this one is larger than 81% of them.
23 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jandiali, Ludhiana (East), Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion in Environmental Clearance of Steel Manufacturing Unit namely "M/s… — environmental approval granted, 700 m away
- Application for issuance of Terms of Reference (TORs) for the existing unit… — lapsed, 1.3 km away
- Expansion in the existing steel manufacturing unit having existing capacity… — lapsed, 1.4 km away
- Expansion in the existing steel manufacturing unit having existing capacity… — cleared for impact study, 1.4 km away
- Expansion in the existing steel manufacturing unit having existing capacity… — cleared for impact study, 1.4 km away
- Expansion in existing Steel Manufacturing unit having existing capacity 26,950… — withdrawn, 1.4 km away
- Cross Walk — environmental approval granted, 2.4 km away
- Expansion in existing steel manufacturing unit by M/s Renny Strips Ltd — cleared for impact study, 2.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.