Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 Jun 2023 |
| Application filed | 6 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Executive Engineer Nangal Mechanical Division With Head Quarter Mohali |
| Land area | 1.1 acres (0.4 ha) |
| Project cost | ₹23 lakh |
| Village / locality | Nagla |
| Taluk / tehsil | Dera Bassi |
| District | Sahibzada Ajit Singh Nagar (Mohali) |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00076 |
In context
12 applications in Mohali since January 2022 are in the same category (Mining): 4 approved, 4 filed or under review, and 4 withdrawn, lapsed or rejected. At 1.1 acres, this one is smaller than 100% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Nagla, Dera Bassi, Mohali, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Tangri-2 Sand Mining Project for Executive Engineer/SAS Nagar Drainage… — environmental approval granted, 650 m away
- Mahindra Swaraj Humayunpur project — forest land use approved, 2.3 km away
- Mahindra And Mahindra Ltd. (Swaraj Division) — environmental approval granted, 2.4 km away
- Razapur(Tangri-5) Sand Mining Project by Executive Engineer/Sas Nagar Drainage… — environmental approval granted, 2.7 km away
- Pipeline project by Torrent Gas Private Limited — lapsed, 6.3 km away
- Industrial & Commercial plotting project Namely "HMT Industrial Park"… — lapsed, 7.3 km away
- Road project by M/S SBL Specialty Coatings Pvt. Ltd. at Village Basauli,… — lapsed, 7.6 km away
- Road project by M/S ADS Spirits Pvt. Ltd. at Village Basauli, Tehsil Dera… — lapsed, 7.6 km away
More from Executive Engineer Nangal Mechanical Division With Head Quarter Mohali in Sahibzada Ajit Singh Nagar
- Bhudki Gravel Mining Project for Executive Engineer/SAS Nagar drainage… — lapsed
- Bhudki Gravel Mining Project for Executive Engineer/SAS Nagar drainage… — cleared for impact study
- Tangri-2 Sand Mining Project for Executive Engineer/SAS Nagar Drainage… — environmental approval granted
- Razapur(Tangri-5) Sand Mining Project by Executive Engineer/Sas Nagar Drainage… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.