Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 1 May 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Executive Engineer Nangal Mechanical Division With Head Quarter Mohali |
| Land area | 45 acres (18.2 ha) |
| Project cost | ₹8.5 crore |
| Village / locality | Khizrabad |
| Taluk / tehsil | Kharar |
| District | Sahibzada Ajit Singh Nagar (Mohali) |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00417 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 1 May 2024 (this page) | Lapsed | 45 acres | ₹8.5 crore |
| Early planning filed 3 Nov 2023 | Cleared for impact study | 45 acres | ₹8.5 crore |
In context
12 applications in Mohali since January 2022 are in the same category (Mining): 4 approved, 4 filed or under review, and 4 withdrawn, lapsed or rejected. At 45 acres, this one is larger than 75% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Khizrabad, Kharar, Mohali, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bhudki Gravel Mining Project for Executive Engineer/SAS Nagar drainage… — cleared for impact study, 0 m away
- Permission for construction of approach Access Retail Outlet Of Indian Oil… — forest land use approved, 2.2 km away
- Building project by Roundglass Wellbeing Pvt LTD — under environmental review, 3.8 km away
- Building project by Roundglass Wellbeing Pvt LTD — cleared for impact study, 3.8 km away
- Industrial project by Mahindra and Mahindra Limited — forest land use approved, 5.2 km away
- Access for Path to the Site of Mirzapur Dam Reservoir's Already Diverted Land… — lapsed, 5.5 km away
- Access for Path to the Site of Mirzapur Dam Reservoir's Already Diverted Land… — lapsed, 5.5 km away
- Access for Path to the Site of Mirzapur Dam Reservoir's Already Diverted Land… — lapsed, 5.5 km away
More from Executive Engineer Nangal Mechanical Division With Head Quarter Mohali in Sahibzada Ajit Singh Nagar
- Tangri-2 Sand Mining Project for Executive Engineer/SAS Nagar Drainage… — environmental approval granted
- Razapur(Tangri-5) Sand Mining Project by Executive Engineer/Sas Nagar Drainage… — environmental approval granted
- Tangri-1 Sand Mining Project by Executive Engineer/SAS Nagar Drainage… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.