Quick answers
What is this project?
Proposed Sand Mining (boulder, gravel, sand) project (site no PO_SN_NS_ST_36,37,37A,38,39 IN DSR)as per approved DSR No. SEIAA/MS/2023/212 with production capacity of 57460 TPA over an area of 10.96 ha on the Sutlej riverbed is a proposed mining project in Saidpur Khurd, Nawanshahr, Shahid Bhagat Singh Nagar, Punjab. The site covers 15.3 acres.
Who is building it?
The applicant is Executive Engineer-Cum- District Mining Officer.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 1 Apr 2024), as of 27 Nov 2026.
Where is it?
In Saidpur Khurd, Nawanshahr, Shahid Bhagat Singh Nagar, Punjab.
How big is it?
It has a stated cost of ₹1.5 crore and a site of 15.3 acres.
When was it filed?
The application was filed on 26 Mar 2024.
Project details
| Official title | Proposed Sand Mining (boulder, gravel, sand) project (site no PO_SN_NS_ST_36,37,37A,38,39 IN DSR)as per approved DSR No. SEIAA/MS/2023/212 with production capacity of 57460 TPA over an area of 10.96 ha on the Sutlej riverbed located at Village- Phol Makaori/Saidpur, Tehsil- Nawashehar, District - SBS Nagar, State Punjab through Executive Engineer/SBS Nagar, Drainage cum Mines and Geology WRD Punjab |
|---|---|
| Status | Cleared for impact study |
| Status since | 1 Apr 2024 |
| Application filed | 26 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Executive Engineer-Cum- District Mining Officer |
| Land area | 15.3 acres (6.2 ha) |
| Project cost | ₹1.5 crore |
| Village / locality | Saidpur Khurd |
| Taluk / tehsil | Nawanshahr |
| District | Shahid Bhagat Singh Nagar |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00089 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 22 Sept 2026 | More information requested | 15.3 acres | ₹1.5 crore |
| Early planning filed 26 Mar 2024 (this page) | Cleared for impact study | 15.3 acres | ₹1.5 crore |
In context
48 applications in Shahid Bhagat Singh Nagar since January 2022 are in the same category (Mining): 30 approved, 7 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 38 days from filing to approval. At 15.3 acres, this one is smaller than 56% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Saidpur Khurd, Nawanshahr, Shahid Bhagat Singh Nagar, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining (boulder, gravel, sand) project (site no… — more information requested, 0 m away
- Proposed Sand Mining (boulder, gravel, sand) project (site no… — returned to applicant, 0 m away
- Proposed Sand mining project, village- Behloor Khurd, District- SBS Nagar… — environmental approval granted, 1.4 km away
- Proposed Sand mining project, village- Behloor Khurd, District- SBS Nagar… — cleared for impact study, 1.4 km away
- Proposed Sand mining project, Village-Mandhala, Mahadipur kalan, District- SBS… — environmental approval granted, 3.8 km away
- Proposed Sand mining project, Village-Mandhala, Mahadipur kalan, District- SBS… — cleared for impact study, 3.8 km away
- Sand Mining Project on the Satluj River Bed — environmental approval granted, 4.1 km away
- Indian Oil Corporation Limited, Village Rahon, S.B.S Nagar — forest land use approved, 7.3 km away
More from Executive Engineer-Cum- District Mining Officer in Shahid Bhagat Singh Nagar
- Proposed Sand Mining Project (site no. PO_SN_BL_ST_22) on the Sutlej riverbed — more information requested
- Proposed sand mining project on the Sutlej River Bed (PO_SN_AR_ST_69) — lapsed
- Sand Mining, Minor Mineral of Village Laalewal, Khoja, Tehsil Nawashehar,… — lapsed
- Sand Mining, Minor Mineral of Village Laalewal, Khoja, Tehsil Nawashehar,… — cleared for impact study
- Proposed sand mining project on the Sutlej River Bed (PO_SN_AR_ST_69) — cleared for impact study
- Proposed sand mining project on the Sutlej River Bed (PO_SN_AR_ST_70) — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.