What is Developing? Open the mapMap

Cleared for impact studyMining · Shahid Bhagat Singh Nagar, Punjab

Proposed Sand mining project, Village-Mandhala, Mahadipur kalan, District- SBS Nagar State Punjab.(total area-8.07 ha). Site (PO_SN_NS_ST_30_31-32_33) as per DSR no. SEIAA/MS/2023/212 by Executive Engineer/SBS Nagar, Drainage cum Mines and Geology WRD Punjab.

Proposed Sand mining project, Village-Mandhala, Mahadipur kalan, District- SBS Nagar State Punjab.(total area-8.07 ha). Site (PO_SN_NS_ST_30_31-32_33) as per DSR no. SEIAA/MS/2023/212 by Executive Engineer/SBS Nagar, Drainage cum Mines and Geology WRD Punjab is a proposed mining project in Tajowal, Nawanshahr, Shahid Bhagat Singh Nagar, Punjab. The site covers 19.9 acres. Its stated project cost is ₹29 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 4 Dec 2023).

See it on the live map All projects in Shahid Bhagat Singh Nagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Sand mining project, Village-Mandhala, Mahadipur kalan, District- SBS Nagar State Punjab.(total area-8.07 ha). Site (PO_SN_NS_ST_30_31-32_33) as per DSR no. SEIAA/MS/2023/212 by Executive Engineer/SBS Nagar, Drainage cum Mines and Geology WRD Punjab is a proposed mining project in Tajowal, Nawanshahr, Shahid Bhagat Singh Nagar, Punjab. The site covers 19.9 acres.

Who is building it?

The applicant is Executive Engineer-Cum- District Mining Officer.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 4 Dec 2023), as of 27 Nov 2026.

Where is it?

In Tajowal, Nawanshahr, Shahid Bhagat Singh Nagar, Punjab.

How big is it?

It has a stated cost of ₹29 lakh and a site of 19.9 acres.

When was it filed?

The application was filed on 4 Dec 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Sand mining project, Village-Mandhala, Mahadipur kalan, District- SBS Nagar…

Project details

StatusCleared for impact study
Status since4 Dec 2023
Application filed4 Dec 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantExecutive Engineer-Cum- District Mining Officer
Land area19.9 acres (8.1 ha)
Project cost₹29 lakh
Village / localityTajowal
Taluk / tehsilNawanshahr
DistrictShahid Bhagat Singh Nagar
StatePunjab
Location fromSite area on record
Our referenceWID-PB-00297

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 14 Jun 2024Environmental approval granted19.9 acres₹29 lakh
Early planning filed 4 Dec 2023 (this page)Cleared for impact study19.9 acres₹29 lakh

In context

48 applications in Shahid Bhagat Singh Nagar since January 2022 are in the same category (Mining): 30 approved, 7 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 38 days from filing to approval. At 19.9 acres, this one is larger than 56% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 35.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 4 mining leases have applied within 5 km.

Where it is

Tajowal, Nawanshahr, Shahid Bhagat Singh Nagar, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Executive Engineer-Cum- District Mining Officer in Shahid Bhagat Singh Nagar

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.