Quick answers
What is this project?
Proposed Sand Mining (boulder, gravel, sand) project (site no ((PO_LD_LD2_ST_38_39_42_43) in DSR) as per approved DSR No. SEIAA/MS/2023/87 with production capacity of 256435 TPA over an area of 16.03 ha on the Sutlej riverbed is a proposed mining project in Chuharwala, Ludhiana (East), Ludhiana, Punjab. The site covers 39.6 acres.
Who is building it?
The applicant is Executive Engineer Cum District Mining Officer Ludhiana.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 7 Jul 2023), as of 27 Nov 2026.
Where is it?
In Chuharwala, Ludhiana (East), Ludhiana, Punjab.
How big is it?
It has a stated cost of ₹1.1 crore and a site of 39.6 acres.
When was it filed?
The application was filed on 7 Jul 2023.
Project details
| Official title | Proposed Sand Mining (boulder, gravel, sand) project (site no ((PO_LD_LD2_ST_38_39_42_43) in DSR) as per approved DSR No. SEIAA/MS/2023/87 with production capacity of 256435 TPA over an area of 16.03 ha on the Sutlej riverbed located at Village- Sujatwal And Chuharwal, Tehsil- Ludhiana-East, District- Ludhiana, State Punjab through Executive Engineer/ Ludhiana, Drainage cum Mines and Geology WRD Punjab |
|---|---|
| Status | Cleared for impact study |
| Status since | 7 Jul 2023 |
| Application filed | 7 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Executive Engineer Cum District Mining Officer Ludhiana |
| Land area | 39.6 acres (16 ha) |
| Project cost | ₹1.1 crore |
| Village / locality | Chuharwala |
| Taluk / tehsil | Ludhiana (East) |
| District | Ludhiana |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00091 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 24 Feb 2024 | Lapsed | 39.6 acres | ₹1.1 crore |
| Early planning filed 7 Jul 2023 (this page) | Cleared for impact study | 39.6 acres | ₹1.1 crore |
In context
65 applications in Ludhiana since January 2022 are in the same category (Mining): 38 approved, 9 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 39.6 acres, this one is larger than 55% of them.
No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.
Where it is
Chuharwala, Ludhiana (East), Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining (boulder, gravel, sand) project (site no… — lapsed, 0 m away
- Proposed Sand Mining (boulder, gravel, sand) Project Site No. PO_LD_LD2_ST_44… — environmental approval granted, 800 m away
- Proposed Minor Mineral (Sand) Mining Project for obtaining Terms of Reference… — more information requested, 1.3 km away
- Proposed Minor Mineral (Sand) Mining Project for obtaining Terms of Reference… — environmental approval granted, 1.3 km away
- Proposed Minor Mineral (Sand) Mining Project for obtaining Terms of Reference… — under environmental review, 1.3 km away
- Transfer of E.C For Sand Mining Project Near Village- Jamalpur leli & Kassabad… — environmental approval granted, 1.6 km away
- Proposed Sand Mining (boulder, gravel, sand) project as per approved DSR No.… — environmental approval granted, 1.6 km away
- Proposed Sand Mining (boulder, gravel, sand) project as per approved DSR No.… — cleared for impact study, 1.6 km away
More from Executive Engineer Cum District Mining Officer Ludhiana in Ludhiana
- Proposed Sand Mining (boulder, gravel, sand) project as per approved DSR No.… — environmental approval granted
- Project for Constructing Surface Pumps for Lifting Water From Sirhind Canal Rd… — lapsed
- Desilting of River Sutlej in between RD 1000-11760 of 4-L Bandh of River… — lapsed
- Desilting of River Sutlej by Abadies and Agricultural Land — not approved
- Desilting of River Sutlej in between RD 38730-40980 of 4-L Bandh of River… — lapsed
- Clearance of silted material between RD 202000-208000 of 3L Bandh River Sutlej… — lapsed
40 Executive Engineer Cum District Mining Officer Ludhiana, Punjab projects in Ludhiana
All 43 Executive Engineer Cum District Mining Officer Ludhiana, Punjab projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.