Quick answers
What is this project?
Proposed Sand Mining (boulder, gravel, sand) project as per approved DSR No. SEIAA/MS/2023/87 on the Sutlej riverbed is an approved mining project in Jamalpur Leli, Ludhiana (East), Ludhiana, Punjab. The site covers 55.7 acres.
Who is building it?
The applicant is Executive Engineer Cum District Mining Officer Ludhiana.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 3 Jun 2026), as of 27 Nov 2026.
Where is it?
In Jamalpur Leli, Ludhiana (East), Ludhiana, Punjab.
How big is it?
It has a stated cost of ₹10.2 crore and a site of 55.7 acres.
When was it filed?
The application was filed on 6 May 2026.
Project details
| Official title | Proposed Sand Mining (boulder, gravel, sand) project as per approved DSR No. SEIAA/MS/2023/87 on the Sutlej riverbed located at Village- Jamalpur leli & Kassabad Tehsil- Ludhiana-East, District- Ludhiana, State Punjab through Executive Engineer/ Ludhiana, Government of Punjab |
|---|---|
| Status | Environmental approval granted |
| Status since | 3 Jun 2026 |
| Application filed | 6 May 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Executive Engineer Cum District Mining Officer Ludhiana |
| Land area | 55.7 acres (22.6 ha) |
| Project cost | ₹10.2 crore |
| Village / locality | Jamalpur Leli |
| Taluk / tehsil | Ludhiana (East) |
| District | Ludhiana |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-01087 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 6 May 2026 (this page) | Environmental approval granted | 55.7 acres | ₹10.2 crore |
| Early planning filed 25 Aug 2023 | Cleared for impact study | 55.7 acres | ₹10.2 crore |
In context
65 applications in Ludhiana since January 2022 are in the same category (Mining): 38 approved, 9 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 55.7 acres, this one is larger than 71% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 78.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 7 mining leases have applied within 5 km.
Where it is
Jamalpur Leli, Ludhiana (East), Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer of E.C For Sand Mining Project Near Village- Jamalpur leli & Kassabad… — environmental approval granted, 0 m away
- Proposed Sand Mining (boulder, gravel, sand) project as per approved DSR No.… — cleared for impact study, 0 m away
- Proposed Minor Mineral (Sand) Mining Project for obtaining Terms of Reference… — more information requested, 500 m away
- Proposed Minor Mineral (Sand) Mining Project for obtaining Terms of Reference… — environmental approval granted, 500 m away
- Proposed Minor Mineral (Sand) Mining Project for obtaining Terms of Reference… — under environmental review, 500 m away
- Clearance of silted material between RD 202000-208000 of 3L Bandh River Sutlej… — lapsed, 600 m away
- Clearance of silted material between RD 202000-208000 of 3L Bandh River Sutlej… — lapsed, 600 m away
- Desilting in Longitudinal Length Opp. Sholey Bazar Complex Rd 193000 to… — lapsed, 650 m away
More from Executive Engineer Cum District Mining Officer Ludhiana in Ludhiana
- Project for Constructing Surface Pumps for Lifting Water From Sirhind Canal Rd… — lapsed
- Desilting of River Sutlej in between RD 1000-11760 of 4-L Bandh of River… — lapsed
- Desilting of River Sutlej by Abadies and Agricultural Land — not approved
- Desilting of River Sutlej in between RD 38730-40980 of 4-L Bandh of River… — lapsed
- Clearance of silted material between RD 202000-208000 of 3L Bandh River Sutlej… — lapsed
- Project for Constructing Surface Pumps for Lifting Water From Sirhind Canal Rd… — lapsed
40 Executive Engineer Cum District Mining Officer Ludhiana, Punjab projects in Ludhiana
All 43 Executive Engineer Cum District Mining Officer Ludhiana, Punjab projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.