Quick answers
What is this project?
Proposed sand mining project (Boulder, gravel, sand) as per DSR NO. SEIAA/MS/2023/87 with production capacity of 432690 TPA over an area of 32.96 Ha on the Satluj River Bed (PO_LD_SB_ST_78_79) is a proposed mining project in Talwandi Nawabad, Jagraon, Ludhiana, Punjab. The site covers 81.4 acres.
Who is building it?
The applicant is Executive Engineer Cum District Mining Officer Ludhiana.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 26 Aug 2023), as of 27 Nov 2026.
Where is it?
In Talwandi Nawabad, Jagraon, Ludhiana, Punjab.
How big is it?
It has a stated cost of ₹3.3 crore and a site of 81.4 acres.
When was it filed?
The application was filed on 26 Aug 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed sand mining project (Boulder, gravel, sand) as per DSR NO. SEIAA/MS/2023/87…
Project details
| Official title | Proposed sand mining project (Boulder, gravel, sand) as per DSR NO. SEIAA/MS/2023/87 with production capacity of 432690 TPA over an area of 32.96 Ha on the Satluj River Bed (PO_LD_SB_ST_78_79) located at village- Manewal, Talwandi Naubaad, Tehsil- Jagraon, District- Ludhiana, Punjab through Executive Engineer/ Ludhiana , Drainage cum Mines and Geology, WRD, Punjab. |
|---|---|
| Status | Cleared for impact study |
| Status since | 26 Aug 2023 |
| Application filed | 26 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Executive Engineer Cum District Mining Officer Ludhiana |
| Land area | 81.4 acres (33 ha) |
| Project cost | ₹3.3 crore |
| Village / locality | Talwandi Nawabad |
| Taluk / tehsil | Jagraon |
| District | Ludhiana |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00166 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 2 Mar 2024 | Environmental approval granted | 81.4 acres | ₹3.3 crore |
| Early planning filed 26 Aug 2023 (this page) | Cleared for impact study | 81.4 acres | ₹3.3 crore |
In context
65 applications in Ludhiana since January 2022 are in the same category (Mining): 38 approved, 9 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 81.4 acres, this one is larger than 82% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Talwandi Nawabad, Jagraon, Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer of E.C for Sand Mining Project — environmental approval granted, 0 m away
- Proposed sand mining project (Boulder, gravel, sand) as per DSR NO.… — environmental approval granted, 0 m away
- Proposed Expansion of Residential Plotted Colony by M/s Eldeco Maksad… — environmental approval granted, 1.3 km away
- Forest Diversion of 0.0045 Ha. of forest land in favour of M/s Eldeco Maksad… — lapsed, 1.4 km away
- Proposed Residential Plotted Colony by M/s Eldeco Maksad Properties Limited — environmental approval granted, 1.4 km away
- Proposed Residential Group Housing 'ELDECO VIVIANA ZEST' by M/s Eldeco Maksad… — environmental approval granted, 1.5 km away
- Group Housing project "Azalleas" by M/s Grandir Infra Private Limited — environmental approval granted, 1.7 km away
- Group Housing project "Azalleas" by M/s Grandir Infra Private Limited — environmental approval granted, 1.7 km away
More from Executive Engineer Cum District Mining Officer Ludhiana in Ludhiana
- Proposed Sand Mining (boulder, gravel, sand) project as per approved DSR No.… — environmental approval granted
- Project for Constructing Surface Pumps for Lifting Water From Sirhind Canal Rd… — lapsed
- Desilting of River Sutlej in between RD 1000-11760 of 4-L Bandh of River… — lapsed
- Desilting of River Sutlej by Abadies and Agricultural Land — not approved
- Desilting of River Sutlej in between RD 38730-40980 of 4-L Bandh of River… — lapsed
- Clearance of silted material between RD 202000-208000 of 3L Bandh River Sutlej… — lapsed
40 Executive Engineer Cum District Mining Officer Ludhiana, Punjab projects in Ludhiana
All 43 Executive Engineer Cum District Mining Officer Ludhiana, Punjab projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.