Quick answers
What is this project?
Expansion of the existing Steel Manufacturing Unit namely M/s K.S Alloys is a proposed industrial project in Kumbh, Amloh, Fatehgarh Sahib, Punjab. The site covers 3.9 acres.
Who is building it?
The applicant is M/S Ks Alloys.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 3 Nov 2023), as of 27 Nov 2026.
Where is it?
In Kumbh, Amloh, Fatehgarh Sahib, Punjab.
How big is it?
It has a stated cost of ₹22.2 crore and a site of 3.9 acres.
When was it filed?
The application was filed on 3 Nov 2023.
Project details
| Official title | Expansion of the existing Steel Manufacturing Unit namely M/s K.S Alloys located at Village Kumbh, Amloh Road, Mandi Gobindgarh, Distt. Fatehgarh Sahib, Punjab for increasing the production capacity from 84 TPD (29,400 TPA) to 410 TPD (1,43,500 TPA) |
|---|---|
| Status | Cleared for impact study |
| Status since | 3 Nov 2023 |
| Application filed | 3 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | M/S Ks Alloys |
| Land area | 3.9 acres (1.6 ha) |
| Project cost | ₹22.2 crore |
| Village / locality | Kumbh |
| Taluk / tehsil | Amloh |
| District | Fatehgarh Sahib |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00193 |
In context
85 applications in Fatehgarh Sahib since January 2022 are in the same category (Industry): 70 approved, 3 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3.9 acres, this one is smaller than 67% of them.
78 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kumbh, Amloh, Fatehgarh Sahib, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- New Steel Manufacturing Unit M/s Eco Special Plates & Flats Private Limited — environmental approval granted, 900 m away
- New Steel Manufacturing Unit M/s Eco Special Plates & Flats Private Limited — cleared for impact study, 900 m away
- Expansion of the existing Steel Manufacturing Unit namely M/s Shree Ram… — environmental approval granted, 900 m away
- Expansion of the existing Steel Manufacturing Unit namely M/s Shree Ram… — more information requested, 900 m away
- New Steel Manufacturing Unit M/s Eco Special Plates & Flats Private Limited — environmental approval granted, 900 m away
- Expansion in the existing Steel manufacturing unit "M/s Neelkanth Multimetals" — environmental approval granted, 1.1 km away
- Expansion in the existing Steel manufacturing unit "M/s Neelkanth Multimetals" — cleared for impact study, 1.1 km away
- Expansion of the existing steel manufacturing unit namely "M/s Devbhoomi… — environmental approval granted, 1.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.