Proposed sand mining project ( Boulder, gravel, sand) as per DSR NO. SEIAA/MS/2023/87 with production capacity of 339428 TPA over an area of 30.4 Ha on the Satluj River Bed is a proposed mining project in Parjia Biharipur, Jagraon, Ludhiana, Punjab. The site covers 75.1 acres.
Who is building it?
The applicant is Executive Engineer Cum District Mining Officer Ludhiana.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 24 Aug 2023), as of 27 Nov 2026.
Where is it?
In Parjia Biharipur, Jagraon, Ludhiana, Punjab.
How big is it?
It has a stated cost of ₹9 crore and a site of 75.1 acres.
When was it filed?
The application was filed on 24 Aug 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed sand mining project ( Boulder, gravel, sand) as per DSR NO. SEIAA/MS/2023/87…
Project details
| Official title | Proposed sand mining project ( Boulder, gravel, sand) as per DSR NO. SEIAA/MS/2023/87 with production capacity of 339428 TPA over an area of 30.4 Ha on the Satluj River Bed located at village-Parijan Biharipur, Tehsil- Sidhwan Bet, District- Ludhiana, Punjab through XEN/DMO District Ludhiana, Government of Punjab. |
|---|---|
| Status | Cleared for impact study |
| Status since | 24 Aug 2023 |
| Application filed | 24 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Executive Engineer Cum District Mining Officer Ludhiana |
| Land area | 75.1 acres (30.4 ha) |
| Project cost | ₹9 crore |
| Village / locality | Parjia Biharipur |
| Taluk / tehsil | Jagraon |
| District | Ludhiana |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00231 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 31 Dec 2025 | Environmental approval granted | 75.1 acres | ₹9 crore |
| Early planning filed 24 Aug 2023 (this page) | Cleared for impact study | 75.1 acres | ₹9 crore |
In context
65 applications in Ludhiana since January 2022 are in the same category (Mining): 38 approved, 9 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 75.1 acres, this one is larger than 77% of them.
No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.
Where it is
Parjia Biharipur, Jagraon, Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand mining project located at Village-Parijan Biharipur, Tehsil- Sidhwan Bet,… — environmental approval granted, 0 m away
- Proposed sand mining project ( Boulder, gravel, sand) as per DSR NO.… — environmental approval granted, 0 m away
- Minor Mineral (Sand) Mining Project for obtaining Terms of Reference (ToR) of… — environmental approval granted, 1.2 km away
- Minor Mineral (Sand) Mining Project for obtaining Terms of Reference (ToR) of… — under environmental review, 1.2 km away
- The Proposed Project Involves Mining of Minor Mineral I.E. Sand From the Bed… — cleared for impact study, 1.6 km away
- Sand Mining Project at Village- Maddepur, Tehsil- Sidhwan Bet, District-… — environmental approval granted, 1.7 km away
- The Proposed Project Involves Mining of Minor Mineral I.E. Sand From the Bed… — environmental approval granted, 1.7 km away
- Proposed Sand Mining Project ( Boulder, Gravel, Sand) As Per Dsr No.… — environmental approval granted, 1.9 km away
More from Executive Engineer Cum District Mining Officer Ludhiana in Ludhiana
- Proposed Sand Mining (boulder, gravel, sand) project as per approved DSR No.… — environmental approval granted
- Project for Constructing Surface Pumps for Lifting Water From Sirhind Canal Rd… — lapsed
- Desilting of River Sutlej in between RD 1000-11760 of 4-L Bandh of River… — lapsed
- Desilting of River Sutlej by Abadies and Agricultural Land — not approved
- Desilting of River Sutlej in between RD 38730-40980 of 4-L Bandh of River… — lapsed
- Clearance of silted material between RD 202000-208000 of 3L Bandh River Sutlej… — lapsed
40 Executive Engineer Cum District Mining Officer Ludhiana, Punjab projects in Ludhiana
All 43 Executive Engineer Cum District Mining Officer Ludhiana, Punjab projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.