What is Developing? Open the mapMap

Cleared for impact studyMining · Ludhiana, Punjab

Proposed sand mining project ( Boulder, gravel, sand) as per DSR NO. SEIAA/MS/2023/87 with production capacity of 339428 TPA over an area of 30.4 Ha on the Satluj River Bed

Proposed sand mining project ( Boulder, gravel, sand) as per DSR NO. SEIAA/MS/2023/87 with production capacity of 339428 TPA over an area of 30.4 Ha on the Satluj River Bed is a proposed mining project in Parjia Biharipur, Jagraon, Ludhiana, Punjab. The site covers 75.1 acres. Its stated project cost is ₹9 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 24 Aug 2023).

See it on the live map All projects in Ludhiana

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed sand mining project ( Boulder, gravel, sand) as per DSR NO. SEIAA/MS/2023/87 with production capacity of 339428 TPA over an area of 30.4 Ha on the Satluj River Bed is a proposed mining project in Parjia Biharipur, Jagraon, Ludhiana, Punjab. The site covers 75.1 acres.

Who is building it?

The applicant is Executive Engineer Cum District Mining Officer Ludhiana.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 24 Aug 2023), as of 27 Nov 2026.

Where is it?

In Parjia Biharipur, Jagraon, Ludhiana, Punjab.

How big is it?

It has a stated cost of ₹9 crore and a site of 75.1 acres.

When was it filed?

The application was filed on 24 Aug 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed sand mining project ( Boulder, gravel, sand) as per DSR NO. SEIAA/MS/2023/87…

Project details

Official titleProposed sand mining project ( Boulder, gravel, sand) as per DSR NO. SEIAA/MS/2023/87 with production capacity of 339428 TPA over an area of 30.4 Ha on the Satluj River Bed located at village-Parijan Biharipur, Tehsil- Sidhwan Bet, District- Ludhiana, Punjab through XEN/DMO District Ludhiana, Government of Punjab.
StatusCleared for impact study
Status since24 Aug 2023
Application filed24 Aug 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantExecutive Engineer Cum District Mining Officer Ludhiana
Land area75.1 acres (30.4 ha)
Project cost₹9 crore
Village / localityParjia Biharipur
Taluk / tehsilJagraon
DistrictLudhiana
StatePunjab
Location fromSite boundary on record
Our referenceWID-PB-00231

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 31 Dec 2025Environmental approval granted75.1 acres₹9 crore
Early planning filed 24 Aug 2023 (this page)Cleared for impact study75.1 acres₹9 crore

In context

65 applications in Ludhiana since January 2022 are in the same category (Mining): 38 approved, 9 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 75.1 acres, this one is larger than 77% of them.

No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.

Where it is

Parjia Biharipur, Jagraon, Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Executive Engineer Cum District Mining Officer Ludhiana in Ludhiana

40 Executive Engineer Cum District Mining Officer Ludhiana, Punjab projects in Ludhiana
All 43 Executive Engineer Cum District Mining Officer Ludhiana, Punjab projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.