Project details
| Official title | The Proposed Project Involves Mining of Minor Mineral I.E. Sand From Ephemerals Strems (Mengarwal Choe) (Mg03) in Village- Chak Gujran, District- Hoshiarpur, State Punjab From an Auctioned Area of 11.51, With Avg. Production Capacity 58241.5 (60873 Peak Production) Proposed by Hoshiarpur, Drainage Cum Mines and Geology, Wrd, Punjab. |
|---|---|
| Status | Cleared for impact study |
| Status since | 27 Jul 2023 |
| Application filed | 27 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Executive Engineer, Hoshiarpur Drainage Division, Hoshiarpur |
| Land area | 28.4 acres (11.5 ha) |
| Project cost | ₹29 lakh |
| Village / locality | Khunde |
| Taluk / tehsil | Hoshiarpur |
| District | Hoshiarpur |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00239 |
In context
37 applications in Hoshiarpur since January 2022 are in the same category (Mining): 24 approved, 2 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 41 days from filing to approval. At 28.4 acres, this one is larger than 86% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Khunde, Hoshiarpur, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Greenfield Formaldehyde (72000 MTPA) and Resin (82,8000 MTPA)… — cleared for impact study, 2 km away
- Proposed Greenfield Formaldehyde (72000 MTPA) and Resin (82,8000 MTPA)… — cleared for impact study, 2 km away
- L.P.G Godown for Parkash HP Gas Agency — lapsed, 4 km away
- Resin Manufacturing Facility Within the Existing Ready Laminate Sheet… — initial checks, 4.1 km away
- Resin Manufacturing Unit Within the Existing Ply-board manufacturing… — environmental approval granted, 4.1 km away
- Approach access road to M/S Universal Dharma Kanda (Wooden Based Industry) — forest land use approved, 4.3 km away
- Proposed Formaldehyde and Resin Manufacturing Unit — cleared for impact study, 4.5 km away
- Resin Manufacturing Unit Within the Existing Plyboard Manufacturing plant by… — environmental approval granted, 4.7 km away
More from Executive Engineer, Hoshiarpur Drainage Division, Hoshiarpur in Hoshiarpur
- Proposed Sand Mining Project (Boulder, Gravel, Sand) As Per Dsr No.… — environmental approval granted
- The Proposed Project Involves Mining of Minor Mineral I.E. Sand From… — environmental approval granted
- Proposed Sand Mining Project (Boulder, Gravel, Sand) As Per Dsr No.… — environmental approval granted
- Proposed sand mining project (Boulder, gravel, sand) as per DSR NO.… — environmental approval granted
- The Proposed Project Involves Mining of Minor Mineral I.E. Sand From… — environmental approval granted
- Proposed sand mining project (Boulder, gravel, sand) as per DSR NO.… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.