What is Developing? Open the mapMap

Cleared for impact studyMining · Hoshiarpur, Punjab

The Proposed Project Involves Mining of Minor Mineral I.E. Sand From Ephemerals Streams (Nasrala Choe) (Ns07,08)

The Proposed Project Involves Mining of Minor Mineral I.E. Sand From Ephemerals Streams (Nasrala Choe) (Ns07,08) is a proposed mining project in Badial, Hoshiarpur, Punjab. The site covers 14.7 acres. Its stated project cost is ₹14 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 22 Aug 2023).

See it on the live map All projects in Hoshiarpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 3 filings for this project. The project's main page, with every filing and where each stands: The Proposed Project Involves Mining of Minor Mineral I.E. Sand From Ephemerals Streams…

Project details

Official titleThe Proposed Project Involves Mining of Minor Mineral I.E. Sand From Ephemerals Streams (Nasrala Choe) (Ns07,08) in Village-Badial, District- Hoshiarpur, State Punjab With Avg. Production Capacity 18265 Tonnes Per Annum Through Executive Engineer/Hoshiarpur, Drainage Cum Mines and Geology Wrd Punjab
StatusCleared for impact study
Status since22 Aug 2023
Application filed22 Aug 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantExecutive Engineer, Hoshiarpur Drainage Division, Hoshiarpur
Land area14.7 acres (5.9 ha)
Project cost₹14 lakh
Village / localityBadial
Taluk / tehsilHoshiarpur
DistrictHoshiarpur
StatePunjab
Location fromSite boundary on record
Our referenceWID-PB-00295

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Ownership transfer filed 12 May 2024Environmental approval granted14.7 acres₹14 lakh
New project filed 23 Mar 2024Environmental approval granted14.7 acres₹14 lakh
Early planning filed 22 Aug 2023 (this page)Cleared for impact study14.7 acres₹14 lakh

In context

37 applications in Hoshiarpur since January 2022 are in the same category (Mining): 24 approved, 2 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 41 days from filing to approval. At 14.7 acres, this one is larger than 70% of them.

No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.

Where it is

Badial, Hoshiarpur, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Executive Engineer, Hoshiarpur Drainage Division, Hoshiarpur in Hoshiarpur

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.