Quick answers
What is River Bed mining project?
River Bed mining project is an approved mining project in Kharkhara Thuthowala (83), Pathankot, Punjab. The site covers 89.7 acres.
Who is building it?
The applicant is Manpreet Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 2 Aug 2024), as of 27 Nov 2026.
Where is it?
In Kharkhara Thuthowala (83), Pathankot, Punjab.
How big is it?
It has a stated cost of ₹3.2 crore and a site of 89.7 acres.
When was it filed?
The application was filed on 31 Jul 2024.
Project details
| Official title | River Bed mining project at Village, Kharkhara, Tehsil & District- Pathankot, Punjab |
|---|---|
| Status | Environmental approval granted |
| Status since | 2 Aug 2024 |
| Application filed | 31 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Manpreet Singh |
| Land area | 89.7 acres (36.3 ha) |
| Project cost | ₹3.2 crore |
| Village / locality | Kharkhara Thuthowala (83) |
| Taluk / tehsil | Pathankot |
| District | Pathankot |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00401 |
In context
109 applications in Pathankot since January 2022 are in the same category (Mining): 55 approved, 42 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 31 days from filing to approval. At 89.7 acres, this one is larger than 92% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 140.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 50 mining leases have applied within 5 km.
Where it is
Kharkhara Thuthowala (83), Pathankot, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- The Proposed Project Involves Mining of Minor Mineral I.E. Rbm From the Bed of… — environmental approval granted, 0 m away
- The Proposed Project Involves Mining of Minor Mineral I.E. Rbm From the Bed of… — cleared for impact study, 0 m away
- Obtaining Term of Reference Minor mineral (Gravel) of mining project Near… — environmental approval granted, 200 m away
- Obtaining Term of Reference Minor mineral (Gravel) of mining project Near… — cleared for impact study, 200 m away
- Obtaining Term of Reference of Environmental Clearance of the area Minor… — environmental approval granted, 250 m away
- Obtaining Term of Reference of Environmental Clearance of the area Minor… — cleared for impact study, 250 m away
- Proposed Minor Mineral (RBM) Mining Project for obtaining Terms of references,… — under environmental review, 250 m away
- Minor Mineral (Gravel) Mining Project for obtaining Terms of Reference (ToR)… — environmental approval granted, 250 m away