Quick answers
What is this project?
The Proposed Project Involves Mining of Minor Mineral I.E. Rbm From the Bed of River Ravi (Pb_ptk_ravi_gravel_02) is a proposed mining project in Mairakalan, Pathankot, Punjab. The site covers 112 acres.
Who is building it?
The applicant is Department of Irrigation.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 22 Feb 2024), as of 27 Nov 2026.
Where is it?
In Mairakalan, Pathankot, Punjab.
How big is it?
It has a stated cost of ₹32 crore and a site of 112 acres.
When was it filed?
The application was filed on 14 Feb 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: The Proposed Project Involves Mining of Minor Mineral I.E. Rbm From the Bed of River…
Project details
| Official title | The Proposed Project Involves Mining of Minor Mineral I.E. Rbm From the Bed of River Ravi (Pb_ptk_ravi_gravel_02) in Village- Kharkhara, Tehsil & District- Pathankot, State Punjab Proposed by Executive Engineer/ Pathankot , Drainage Cum Mines and Geology, Wrd, Punjab. |
|---|---|
| Status | Cleared for impact study |
| Status since | 22 Feb 2024 |
| Application filed | 14 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Department of Irrigation |
| Land area | 112 acres (45.3 ha) |
| Project cost | ₹32 crore |
| Village / locality | Mairakalan |
| Taluk / tehsil | Pathankot |
| District | Pathankot |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00324 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 24 May 2024 | Environmental approval granted | 112 acres | ₹32 crore |
| Early planning filed 14 Feb 2024 (this page) | Cleared for impact study | 112 acres | ₹32 crore |
In context
109 applications in Pathankot since January 2022 are in the same category (Mining): 55 approved, 42 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 31 days from filing to approval. At 112 acres, this one is larger than 98% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 162.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 50 mining leases have applied within 5 km.
Where it is
Mairakalan, Pathankot, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- River Bed mining project — environmental approval granted, 0 m away
- The Proposed Project Involves Mining of Minor Mineral I.E. Rbm From the Bed of… — environmental approval granted, 0 m away
- Obtaining Term of Reference Minor mineral (Gravel) of mining project Near… — environmental approval granted, 200 m away
- Obtaining Term of Reference Minor mineral (Gravel) of mining project Near… — cleared for impact study, 200 m away
- Obtaining Term of Reference of Environmental Clearance of the area Minor… — environmental approval granted, 250 m away
- Obtaining Term of Reference of Environmental Clearance of the area Minor… — cleared for impact study, 250 m away
- Proposed Minor Mineral (RBM) Mining Project for obtaining Terms of references,… — under environmental review, 250 m away
- Minor Mineral (Gravel) Mining Project for obtaining Terms of Reference (ToR)… — environmental approval granted, 250 m away
More from Department of Irrigation in Pathankot
- Amendment in Environmental Clearance Granted by Seiaa, Punjab Vide File No.… — lapsed
- Proposed Sand Mining Project (Boulder, Gravel, Sand) As Per Dsr No.… — withdrawn
- Mining of minor mineral i.e.RBM from the bed of river Ravi — withdrawn
- Proposed RBM mining project having an area 4.14 Ha — lapsed
- The Proposed Project Involves Mining of Minor Mineral I.E. Rbm From the Bed of… — lapsed
- The Proposed Project Involves Mining of Minor Mineral I.E. Rbm From the Bed of… — cleared for impact study
15 Department of Irrigation, Punjab projects in Pathankot
All 157 Department of Irrigation, Punjab projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.