Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 4 May 2026 |
| Application filed | 25 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Roundglass Wellbeing Private Limited |
| Use | Township |
| Land area | 233.5 acres (94.5 ha) |
| Plot area | 5,28,755 m² (56,91,466 sq ft) |
| Project cost | ₹392 crore |
| Village / locality | Khadari |
| Taluk / tehsil | Kharar |
| District | Sahibzada Ajit Singh Nagar (Mohali) |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00710 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 7 Oct 2026 | Under environmental review | 233.5 acres | ₹392 crore |
| Early planning filed 25 Dec 2025 (this page) | Cleared for impact study | 233.5 acres | ₹392 crore |
In context
384 applications in Mohali since January 2022 are in the same category (Buildings & townships): 276 approved, 60 filed or under review, and 48 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 233.5 acres, this one is larger than 92% of them.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khadari, Kharar, Mohali, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building project by Roundglass Wellbeing Pvt LTD — under environmental review, 0 m away
- M/S Hindustan Petroleum Corporation LTD. for Approach Road to Setting Up a New… — forest land use approved, 3.2 km away
- Permission for construction of approach Access Retail Outlet Of Indian Oil… — forest land use approved, 3.4 km away
- Bhudki Gravel Mining Project for Executive Engineer/SAS Nagar drainage… — lapsed, 3.8 km away
- Bhudki Gravel Mining Project for Executive Engineer/SAS Nagar drainage… — cleared for impact study, 3.8 km away
- Industrial project by Mahindra and Mahindra Limited — forest land use approved, 3.8 km away
- Area development Project namely "Ecocity Phase -2" by M/s Greater Mohali Area… — lapsed, 3.9 km away
- Diversion of 0.3773 Hectare of forest land in the favor of Divisional… — initial checks, 4.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.