Quick answers
What is Proposed RBM mining project having an area 4.14 Ha?
Proposed RBM mining project having an area 4.14 Ha is a lapsed mining project in Samrala, Pathankot, Punjab. The site covers 10.2 acres.
Who is building it?
The applicant is Department of Irrigation.
Has it been approved?
No. The application was lapsed on 29 Oct 2025, so it is no longer under consideration.
Where is it?
In Samrala, Pathankot, Punjab.
How big is it?
It has a stated cost of ₹72 lakh and a site of 10.2 acres.
When was it filed?
The application was filed on 18 Feb 2025.
Project details
| Official title | Proposed RBM mining project having an area 4.14 Ha at Village Samrala District Pathankot |
|---|---|
| Status | Lapsed |
| Status since | 29 Oct 2025 |
| Application filed | 18 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Department of Irrigation |
| Land area | 10.2 acres (4.1 ha) |
| Project cost | ₹72 lakh |
| Village / locality | Samrala |
| Taluk / tehsil | Pathankot |
| District | Pathankot |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00715 |
In context
109 applications in Pathankot since January 2022 are in the same category (Mining): 55 approved, 42 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 31 days from filing to approval. At 10.2 acres, this one is smaller than 56% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 85.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.
Where it is
Samrala, Pathankot, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining Project (Boulder, Gravel, Sand) As Per Dsr No.… — withdrawn, 150 m away
- The Proposed Project Involves Mining of Minor Mineral I.E. Rbm From the Bed of… — lapsed, 250 m away
- The Proposed Project Involves Mining of Minor Mineral I.E. Rbm From the Bed of… — cleared for impact study, 250 m away
- Proposed Minor Mineral (Gravel) Mining Project for obtaining Environment… — environmental approval granted, 550 m away
- USE OF 0.0574 HECTARE OF FOREST LAND IN FAVOUR OF M/S BHARAT SANCHAR NIGAM… — lapsed, 2 km away
- Proposed Minor Mineral (Gravel) Mining Project for obtaining Environment… — environmental approval granted, 7.9 km away
- Proposed Minor Mineral (RBM) Mining Project for obtaining Terms of references,… — more information requested, 8.4 km away
- Desilting of Riverbed Material to increase Water carrying capacity of River… — more information requested, 8.5 km away
More from Department of Irrigation in Pathankot
- Amendment in Environmental Clearance Granted by Seiaa, Punjab Vide File No.… — lapsed
- Proposed Sand Mining Project (Boulder, Gravel, Sand) As Per Dsr No.… — withdrawn
- Mining of minor mineral i.e.RBM from the bed of river Ravi — withdrawn
- The Proposed Project Involves Mining of Minor Mineral I.E. Rbm From the Bed of… — lapsed
- The Proposed Project Involves Mining of Minor Mineral I.E. Rbm From the Bed of… — cleared for impact study
- Mining of minor mineral i.e. RBM from the bed of river Ravi — environmental approval granted
15 Department of Irrigation, Punjab projects in Pathankot
All 157 Department of Irrigation, Punjab projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.