Quick answers
What is Mining of minor mineral i.e.RBM from the bed of river Ravi?
Mining of minor mineral i.e.RBM from the bed of river Ravi is a withdrawn mining project in Chak Hariral, Pathankot, Punjab. The site covers 34.1 acres.
Who is building it?
The applicant is Department of Irrigation.
Has it been approved?
No. The application was withdrawn on 24 Feb 2025, so it is no longer under consideration.
Where is it?
In Chak Hariral, Pathankot, Punjab.
How big is it?
It has a stated cost of ₹1.8 crore and a site of 34.1 acres.
When was it filed?
The application was filed on 20 Feb 2025.
Project details
| Official title | Mining of minor mineral i.e.RBM from the bed of river Ravi in Village- Maira Kalan, Tehsil- Pathankot, District- pathankot (Punjab) (Total Mining Area 13.81 HA. With average production of 246343 TPA) proposed by Executive Engineer/ Pathankot , Drainage cum Mines and Geology, WRD, Punjab. |
|---|---|
| Status | Withdrawn |
| Status since | 24 Feb 2025 |
| Application filed | 20 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Department of Irrigation |
| Land area | 34.1 acres (13.8 ha) |
| Project cost | ₹1.8 crore |
| Village / locality | Chak Hariral |
| Taluk / tehsil | Pathankot |
| District | Pathankot |
| State | Punjab |
| Location from | Site area on record |
| Our reference | WID-PB-00067 |
In context
109 applications in Pathankot since January 2022 are in the same category (Mining): 55 approved, 42 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 31 days from filing to approval. At 34.1 acres, this one is larger than 83% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 68.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 52 mining leases have applied within 5 km.
Where it is
Chak Hariral, Pathankot, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- River bed Mining project — environmental approval granted, 0 m away
- Mining of minor mineral i.e. RBM from the bed of river Ravi — environmental approval granted, 450 m away
- Mining of minor mineral i.e. RBM from the bed of river Ravi — cleared for impact study, 450 m away
- This is a proposed Minor Mineral (RBM) Mining Project, located near Village-… — under environmental review, 600 m away
- Proposed Minor Mineral (RBM) Mining Project for obtaining Terms of references,… — under environmental review, 1000 m away
- CRMS-197 site at village Maira Kalan,Pathankot by M/s Kiran Stone Crusher — under environmental review, 1.1 km away
- River bed mining project — environmental approval granted, 1.5 km away
- Obtaining Term of Reference of Environmental Clearance of the area Minor… — environmental approval granted, 1.5 km away
More from Department of Irrigation in Pathankot
- Amendment in Environmental Clearance Granted by Seiaa, Punjab Vide File No.… — lapsed
- Proposed Sand Mining Project (Boulder, Gravel, Sand) As Per Dsr No.… — withdrawn
- Proposed RBM mining project having an area 4.14 Ha — lapsed
- The Proposed Project Involves Mining of Minor Mineral I.E. Rbm From the Bed of… — lapsed
- The Proposed Project Involves Mining of Minor Mineral I.E. Rbm From the Bed of… — cleared for impact study
- Mining of minor mineral i.e. RBM from the bed of river Ravi — environmental approval granted
15 Department of Irrigation, Punjab projects in Pathankot
All 157 Department of Irrigation, Punjab projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.