What is Developing? Open the mapMap

WithdrawnMining · Pathankot, Punjab

Mining of minor mineral i.e.RBM from the bed of river Ravi

Mining of minor mineral i.e.RBM from the bed of river Ravi is a withdrawn mining project in Chak Hariral, Pathankot, Punjab. The site covers 34.1 acres. Its stated project cost is ₹1.8 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 24 Feb 2025).

See it on the live map All projects in Pathankot

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Mining of minor mineral i.e.RBM from the bed of river Ravi?

Mining of minor mineral i.e.RBM from the bed of river Ravi is a withdrawn mining project in Chak Hariral, Pathankot, Punjab. The site covers 34.1 acres.

Who is building it?

The applicant is Department of Irrigation.

Has it been approved?

No. The application was withdrawn on 24 Feb 2025, so it is no longer under consideration.

Where is it?

In Chak Hariral, Pathankot, Punjab.

How big is it?

It has a stated cost of ₹1.8 crore and a site of 34.1 acres.

When was it filed?

The application was filed on 20 Feb 2025.

Project details

Official titleMining of minor mineral i.e.RBM from the bed of river Ravi in Village- Maira Kalan, Tehsil- Pathankot, District- pathankot (Punjab) (Total Mining Area 13.81 HA. With average production of 246343 TPA) proposed by Executive Engineer/ Pathankot , Drainage cum Mines and Geology, WRD, Punjab.
StatusWithdrawn
Status since24 Feb 2025
Application filed20 Feb 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantDepartment of Irrigation
Land area34.1 acres (13.8 ha)
Project cost₹1.8 crore
Village / localityChak Hariral
Taluk / tehsilPathankot
DistrictPathankot
StatePunjab
Location fromSite area on record
Our referenceWID-PB-00067

In context

109 applications in Pathankot since January 2022 are in the same category (Mining): 55 approved, 42 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 31 days from filing to approval. At 34.1 acres, this one is larger than 83% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 68.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 52 mining leases have applied within 5 km.

Where it is

Chak Hariral, Pathankot, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Department of Irrigation in Pathankot

15 Department of Irrigation, Punjab projects in Pathankot
All 157 Department of Irrigation, Punjab projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.