Quick answers
What is this project?
Balliewal Sand Mining Project (Off River Bed) at Paleochannel of River Satluj of Balliewal Sand mining project (off river bed), Village-Balliewal, Tehsil-Ludhiana, District- Ludhiana, Punjab, Hadbast No.-17, Area of 16.20 ha is a lapsed mining project in Baliawal, Ludhiana (East), Ludhiana, Punjab. The site covers 40 acres.
Who is building it?
The applicant is Pinjore Royalty Company.
Has it been approved?
No. The application was lapsed on 6 Mar 2025, so it is no longer under consideration.
Where is it?
In Baliawal, Ludhiana (East), Ludhiana, Punjab.
How big is it?
It has a stated cost of ₹4.7 crore and a site of 40 acres.
When was it filed?
The application was filed on 3 Feb 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 6 Mar 2025 |
| Application filed | 3 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Pinjore Royalty Company |
| Land area | 40 acres (16.2 ha) |
| Project cost | ₹4.7 crore |
| Village / locality | Baliawal |
| Taluk / tehsil | Ludhiana (East) |
| District | Ludhiana |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00848 |
In context
65 applications in Ludhiana since January 2022 are in the same category (Mining): 38 approved, 9 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 40 acres, this one is larger than 58% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Baliawal, Ludhiana (East), Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- New Synthetic Organic Chemical Manufacturing Unit (Dyes and Dye Intermediates;… — cleared for impact study, 1.7 km away
- Desilting of River Sutlej by Abadies and Agricultural Land — not approved, 4.9 km away
- Minor Mineral (Sand) Mining Project, located near Village – Hadiwal, Tehsil &… — environmental approval granted, 5 km away
- Setting up a manufacturing unit of Synthetic Organic Chemicals (Dyes and Dye… — environmental approval granted, 5.2 km away
- Setting up a manufacturing unit of Synthetic Organic Chemicals (Dyes and Dye… — returned to applicant, 5.2 km away
- Setting up a manufacturing unit of Synthetic Organic Chemicals (Dyes and Dye… — cleared for impact study, 5.2 km away
- Proposed Sand Mining (boulder, gravel, sand) project (site no PO_SN_AR_ST_61… — environmental approval granted, 5.3 km away
- Desilting of River Sutlej at Mand Chaunta Complex in Between RD… — not approved, 5.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.