Quick answers
What is this project?
Desilting of River Sutlej at Mand Chaunta Complex in Between RD 122000-125000/3L bandh to stream line the flow of River is a rejected mining project in Hadiwal, Ludhiana (East), Ludhiana, Punjab. The site covers 113.3 acres.
Who is building it?
The applicant is Executive Engineer Cum District Mining Officer Ludhiana.
Has it been approved?
No. The application was rejected on 12 Aug 2024.
Where is it?
In Hadiwal, Ludhiana (East), Ludhiana, Punjab.
How big is it?
It has a site of 113.3 acres and 52.1 acres (21.1 ha) of forest land.
When was it filed?
The application was filed on 16 Jul 2024.
Project details
| Status | Not approved |
|---|---|
| Status since | 12 Aug 2024 |
| Application filed | 16 Jul 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Mining |
| Applicant | Executive Engineer Cum District Mining Officer Ludhiana |
| Land area | 113.3 acres (45.9 ha) |
| Forest land | 52.1 acres (21.1 ha) |
| Village / locality | Hadiwal |
| Taluk / tehsil | Ludhiana (East) |
| District | Ludhiana |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-03345 |
In context
65 applications in Ludhiana since January 2022 are in the same category (Mining): 38 approved, 9 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 113.3 acres, this one is larger than 89% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Hadiwal, Ludhiana (East), Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand mining project, Village- Talwandi sibhu , District- SBS Nagar… — more information requested, 650 m away
- Proposed Sand mining project, Village- Talwandi sibhu , District- SBS Nagar… — cleared for impact study, 650 m away
- Minor Mineral (Sand) Mining Project, located near Village – Hadiwal, Tehsil &… — environmental approval granted, 1.2 km away
- Proposed Sand Mining (boulder, gravel, sand) project (site no PO_SN_AR_ST_61… — environmental approval granted, 2.3 km away
- Desilting of River Sutlej by Abadies and Agricultural Land — not approved, 2.5 km away
- Proposed sand mining project on the Sutlej River Bed (PO_SN_AR_ST_72) — cleared for impact study, 4.4 km away
- Proposed Sand Mining (boulder, gravel, sand) project (site no… — environmental approval granted, 4.7 km away
- Proposed Sand Mining (boulder, gravel, sand) project (site no… — cleared for impact study, 4.7 km away
More from Executive Engineer Cum District Mining Officer Ludhiana in Ludhiana
- Proposed Sand Mining (boulder, gravel, sand) project as per approved DSR No.… — environmental approval granted
- Project for Constructing Surface Pumps for Lifting Water From Sirhind Canal Rd… — lapsed
- Desilting of River Sutlej in between RD 1000-11760 of 4-L Bandh of River… — lapsed
- Desilting of River Sutlej by Abadies and Agricultural Land — not approved
- Desilting of River Sutlej in between RD 38730-40980 of 4-L Bandh of River… — lapsed
- Clearance of silted material between RD 202000-208000 of 3L Bandh River Sutlej… — lapsed
40 Executive Engineer Cum District Mining Officer Ludhiana, Punjab projects in Ludhiana
All 43 Executive Engineer Cum District Mining Officer Ludhiana, Punjab projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.