Quick answers
What is this project?
Proposed Minor Mineral (Sand) Mining Project for obtaining Terms of Reference (ToR) of Environmental Clearance, located near Village - Mau Tehsil - Phillaur, District Jalandhar, Punjab with a lease area of 1.66 ha in favor of Shree Ganesh Mining Company (LMS-95) is a proposed mining project in Mao, Phillaur, Jalandhar, Punjab. The site covers 4.1 acres.
Who is building it?
The applicant is Shree Ganesh Mining Company.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Mao, Phillaur, Jalandhar, Punjab.
How big is it?
It has a stated cost of ₹1.3 crore and a site of 4.1 acres.
When was it filed?
The application was filed on 9 Oct 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 22 Oct 2026 |
| Application filed | 9 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Shree Ganesh Mining Company |
| Land area | 4.1 acres (1.7 ha) |
| Project cost | ₹1.3 crore |
| Village / locality | Mao |
| Taluk / tehsil | Phillaur |
| District | Jalandhar |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00984 |
In context
46 applications in Jalandhar since January 2022 are in the same category (Mining): 25 approved, 14 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.1 acres, this one is smaller than 96% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 48.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Mao, Phillaur, Jalandhar, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining of Minor Minerals (Sand) From the Bed of River Satluj — lapsed, 250 m away
- Mianwal Sand Mining Project by Executive Engineer/Jalandhar,… — environmental approval granted, 2 km away
- Diversion of 1.0390 ha. of Forest land for laying of optical fibre cable from… — forest land use approved, 3.6 km away
- Burj Hassan (Sidhara) Sand Mining Project by Executive Engineer/Jalandhar,… — environmental approval granted, 8.6 km away
- Minor Mineral (Sand) Mining Project for obtaining Terms of Reference (ToR) of… — more information requested, 9.1 km away
- Minor Mineral (Sand) Mining Project for obtaining Terms of Reference (ToR) of… — environmental approval granted, 9.1 km away
- Minor Mineral (Sand) Mining Project for obtaining Terms of Reference (ToR) of… — cleared for impact study, 9.1 km away
- Minor Mineral (Sand) Mining Project for obtaining Terms of Reference (ToR) of… — more information requested, 9.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.