Quick answers
What is this project?
Diversion of 1.0390 ha. of Forest land for laying of optical fibre cable from Phillaur to Umarpura Bus Stand via Ganna Pind & Talwan Length 22000 Meter, Phillaur Distributory Length=300 Meter & Nakodar to Mehatpur Road Length=400 Meter Total Length=22700 Meter under Forest Division & Distt. Jalandhar Punjab is an approved telecom project in Nangal, Phillaur, Jalandhar, Punjab. The site covers 2.6 acres.
Who is building it?
The applicant is Bharti Airtel Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 24 Jul 2025), as of 27 Nov 2026.
Where is it?
In Nangal, Phillaur, Jalandhar, Punjab.
How big is it?
It has a stated cost of ₹34 lakh; a site of 2.6 acres and 2.6 acres (1 ha) of forest land.
When was it filed?
The application was filed on 11 Jan 2024.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 24 Jul 2025 |
| Application filed | 11 Jan 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Bharti Airtel Limited |
| Land area | 2.6 acres (1 ha) |
| Forest land | 2.6 acres (1 ha) |
| Project cost | ₹34 lakh |
| Village / locality | Nangal |
| Taluk / tehsil | Phillaur |
| District | Jalandhar |
| State | Punjab |
| Location from | Site area on record |
| Our reference | WID-PB-02690 |
In context
9 applications in Jalandhar since January 2022 are in the same category (Telecom): 6 approved, 1 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 13 months from filing to approval.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nangal, Phillaur, Jalandhar, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mianwal Sand Mining Project by Executive Engineer/Jalandhar,… — environmental approval granted, 3.1 km away
- Mining of Minor Minerals (Sand) From the Bed of River Satluj — lapsed, 3.3 km away
- Proposed Minor Mineral (Sand) Mining Project for obtaining Terms of Reference… — under environmental review, 3.6 km away
- Burj Hassan (Sidhara) Sand Mining Project by Executive Engineer/Jalandhar,… — environmental approval granted, 9 km away
- Dhagara 1 Sand Mining Project, Executive Engineer/Jalandhar,… — environmental approval granted, 10.5 km away
- Dhagara 1 Sand Mining Project, Executive Engineer/Jalandhar,… — environmental approval granted, 10.5 km away
- Dhagara 1 Sand Mining Project, Executive Engineer/Jalandhar,… — more information requested, 10.5 km away
- Approach Road to "The Sukh Resorts & Hotel" belongs to M/s The Sukh Resorts — lapsed, 10.6 km away
More from Bharti Airtel Limited in Jalandhar
- Diversion of 0.3417 ha. of Forest land for laying of optical fibre cable by… — forest land use approved
All 485 Bharti Airtel (Airtel) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.