Quick answers
What is this project?
Minor Mineral Mining Project (Crms-47) Hadbast No.78, Area-5.0 Ha ,located is an approved mining project in Siunti Tarafnarot, Pathankot, Punjab. The site covers 12.4 acres.
Who is building it?
The applicant is Ajay singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 25 May 2026), as of 27 Nov 2026.
Where is it?
In Siunti Tarafnarot, Pathankot, Punjab.
How big is it?
It has a stated cost of ₹2.3 crore and a site of 12.4 acres.
When was it filed?
The application was filed on 22 Apr 2026.
Project details
| Official title | Minor Mineral Mining Project (Crms-47) Hadbast No.78, Area-5.0 Ha ,located at Village Siyonti Tehsil and District Pathankot |
|---|---|
| Status | Environmental approval granted |
| Status since | 25 May 2026 |
| Application filed | 22 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ajay singh |
| Land area | 12.4 acres (5 ha) |
| Project cost | ₹2.3 crore |
| Village / locality | Siunti Tarafnarot |
| Taluk / tehsil | Pathankot |
| District | Pathankot |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-01047 |
In context
109 applications in Pathankot since January 2022 are in the same category (Mining): 55 approved, 42 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 31 days from filing to approval. At 12.4 acres, this one is larger than 68% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 17.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 51 mining leases have applied within 5 km.
Where it is
Siunti Tarafnarot, Pathankot, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Minor Mineral (GRAVEL) Mining Project for obtaining Terms of… — under environmental review, 500 m away
- Proposed Minor Mineral (Gravel) Mining Project for obtaining Terms of… — under environmental review, 600 m away
- This is a proposed Minor Mineral (RBM) Mining Project , located near Village-… — under environmental review, 600 m away
- Minor Mineral Gravel Mining Project(CRMS190) for obtaining Terms of reference,… — more information requested, 650 m away
- Proposed Minor Mineral (RBM) Mining Project for obtaining Terms of references,… — under environmental review, 700 m away
- Proposed Minor Mineral (Gravel) Mining Project for Obtaining Terms of… — under environmental review, 750 m away
- Proposed Minor Mineral (RBM) Mining Project for obtaining Terms of references,… — under environmental review, 750 m away
- CRMS 200 site at village Siunti Taraf Narot Jaimal Singh,Pathankot — under environmental review, 800 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.