Quick answers
What is this project?
Desilting in Longitudinal Length Opp. Sholey Bazar Complex Rd 193000 to 201500/1r Bandh to Guide the Flow of River Sutlej is a lapsed mining project in Kasabad, Ludhiana (East), Ludhiana, Punjab. The site covers 5.3 acres.
Who is building it?
The applicant is Executive Engineer-Cum-District Mining Officer.
Has it been approved?
No. The application was lapsed on 9 Apr 2026, so it is no longer under consideration.
Where is it?
In Kasabad, Ludhiana (East), Ludhiana, Punjab.
How big is it?
It has a stated cost of ₹2.6 crore; a site of 5.3 acres and 5.3 acres (2.2 ha) of forest land.
When was it filed?
The application was filed on 7 Mar 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 9 Apr 2026 |
| Application filed | 7 Mar 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Mining |
| Applicant | Executive Engineer-Cum-District Mining Officer |
| Land area | 5.3 acres (2.2 ha) |
| Forest land | 5.3 acres (2.2 ha) |
| Project cost | ₹2.6 crore |
| Village / locality | Kasabad |
| Taluk / tehsil | Ludhiana (East) |
| District | Ludhiana |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-02517 |
In context
65 applications in Ludhiana since January 2022 are in the same category (Mining): 38 approved, 9 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5.3 acres, this one is smaller than 95% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 60.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 8 mining leases have applied within 5 km.
Where it is
Kasabad, Ludhiana (East), Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Clearance of silted material between RD 202000-208000 of 3L Bandh River Sutlej… — lapsed, 250 m away
- Clearance of silted material between RD 202000-208000 of 3L Bandh River Sutlej… — lapsed, 250 m away
- Transfer of E.C For Sand Mining Project Near Village- Jamalpur leli & Kassabad… — environmental approval granted, 650 m away
- Proposed Sand Mining (boulder, gravel, sand) project as per approved DSR No.… — environmental approval granted, 650 m away
- Proposed Sand Mining (boulder, gravel, sand) project as per approved DSR No.… — cleared for impact study, 650 m away
- Proposed Minor Mineral (Sand) Mining Project for obtaining Terms of Reference… — more information requested, 1.1 km away
- Proposed Minor Mineral (Sand) Mining Project for obtaining Terms of Reference… — environmental approval granted, 1.1 km away
- Proposed Minor Mineral (Sand) Mining Project for obtaining Terms of Reference… — under environmental review, 1.1 km away
More from Executive Engineer-Cum-District Mining Officer in Ludhiana
- Proposed sand mining project on the Sutlej River Bed (PO_SN_AR_ST_72) — cleared for impact study
- Desilting in Longitudinal Length Opp. Opp. Sangowal Phillaur Complex Rd 40500… — lapsed
- Proposed Sand mining project, Village- Talwandi sibhu , District- SBS Nagar… — more information requested
- Proposed Sand mining project, Village- Talwandi sibhu , District- SBS Nagar… — cleared for impact study
- Proposed sand mining project as per DSR NO. SEIAA/MS/2023/212 on the Sutlej… — environmental approval granted
- Proposed Sand Mining (boulder, gravel, sand) project (site no PO_SN_AR_ST_61… — environmental approval granted
All 7 Executive Engineer-Cum-District Mining Officer, Punjab projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.