Quick answers
What is this project?
Proposed Minor Mineral (Sand) Mining Project for obtaining Environmental Clearance, located near Village - Pipli Tehsil - Shahkot (Lohian), District Jalandhar, Punjab with a lease area of 1.752327 ha in favor of Raj Kumar Taneja & Co (LMS 50) is a proposed mining project in Pipli, Shahkot, Jalandhar, Punjab. The site covers 4.3 acres.
Who is building it?
The applicant is Raj Kumar Taneja.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Pipli, Shahkot, Jalandhar, Punjab.
How big is it?
It has a stated cost of ₹1.7 crore and a site of 4.3 acres.
When was it filed?
The application was filed on 6 Oct 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 17 Oct 2026 |
| Application filed | 6 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Raj Kumar Taneja |
| Land area | 4.3 acres (1.8 ha) |
| Project cost | ₹1.7 crore |
| Village / locality | Pipli |
| Taluk / tehsil | Shahkot |
| District | Jalandhar |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-01155 |
In context
46 applications in Jalandhar since January 2022 are in the same category (Mining): 25 approved, 14 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.3 acres, this one is smaller than 93% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Pipli, Shahkot, Jalandhar, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Adraman Sand Mining Project, Executive Engineer/Ferozepur, Drainage-Cum-Mining… — environmental approval granted, 2.8 km away
- Adraman Sand Mining Project, Executive Engineer/Ferozepur, Drainage-Cum-Mining… — cleared for impact study, 2.8 km away
- Rampur/Thamuwal Sand Mining Project by Executive Engineer/Jalandhar,… — environmental approval granted, 11.4 km away
- Laying of optical fiber cable on Nakodar-Kapurthala Road, Sarih… — forest land use approved, 12.5 km away
- Approach road to retail outlet of Reliance BP Mobility Limited — more information requested, 14.7 km away
- Guru Nanak Enclave — forest land use approved, 15.2 km away
- Forest Clearance for Constrcution of Railway Station Building at Malsian… — forest land use approved, 15.5 km away
- Bangiwal Sand Mining Project, Executive Engineer/Jalandhar,… — environmental approval granted, 23.3 km away
More from Raj Kumar Taneja in Jalandhar
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.