Quick answers
What is this project?
Proposed Minor Mineral (Sand) Mining Project for obtaining Terms of Reference (ToR) of Environmental Clearance, located near Village - Kadiana Tehsil - Phillaur, District Jalandhar, Punjab with a lease area of 2.43 ha in favor of Raj Kumar Taneja & Co (LMS 56) is a lapsed mining project in Kariana, Phillaur, Jalandhar, Punjab. The site covers 6 acres.
Who is building it?
The applicant is Raj Kumar Taneja.
Has it been approved?
No. The application was lapsed on 22 Oct 2026, so it is no longer under consideration.
Where is it?
In Kariana, Phillaur, Jalandhar, Punjab.
How big is it?
It has a stated cost of ₹3.6 crore and a site of 6 acres.
When was it filed?
The application was filed on 21 Sept 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 22 Oct 2026 |
| Application filed | 21 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Raj Kumar Taneja |
| Land area | 6 acres (2.4 ha) |
| Project cost | ₹3.6 crore |
| Village / locality | Kariana |
| Taluk / tehsil | Phillaur |
| District | Jalandhar |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-01206 |
In context
46 applications in Jalandhar since January 2022 are in the same category (Mining): 25 approved, 14 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 6 acres, this one is smaller than 85% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Kariana, Phillaur, Jalandhar, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kadiana Sand Mining Project by Executive Engineer/Jalandhar,… — environmental approval granted, 750 m away
- Reliance BP Mobility Limited Village- Sailkiana Distt – Jalandhar — initial checks, 4 km away
- Approach Road to retail outlet of NAYARA ENERGY LIMITED — lapsed, 5.5 km away
- Proposed Sand Mining Project ( Boulder, Gravel, Sand) As Per Dsr No.… — more information requested, 5.5 km away
- Proposed Sand Mining Project ( Boulder, Gravel, Sand) As Per Dsr No.… — cleared for impact study, 5.5 km away
- Mining of Minor Minerals (Sand) from the river bed of River Sutlej having… — under environmental review, 6.1 km away
- Mining of Minor Minerals (Sand) from the river bed of River Sutlej having… — cleared for impact study, 6.1 km away
- Mining of Minor Minerals (Sand) from the river bed of Sutlej River having… — withdrawn, 6.1 km away
More from Raj Kumar Taneja in Jalandhar
- Proposed Minor Mineral (Sand) Mining Project for obtaining Environmental… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.