Quick answers
What is this project?
This is a proposed Minor Mineral (RBM) Mining Project, located near Village- Maira Kalan, District Pathankot, Punjab, with Hadbast No. 87 and lease area of 4.86 ha (Non-Forest Private Land), interlinked with Shri Balaji Stone Crusher. (CRMS 160) proposed by Rajat Sharma is a proposed mining project in Mairakalan, Pathankot, Punjab. The site covers 12 acres.
Who is building it?
The applicant is Rajjat Sharma.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Mairakalan, Pathankot, Punjab.
How big is it?
It has a stated cost of ₹2.8 crore and a site of 12 acres.
When was it filed?
The application was filed on 20 Aug 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 25 Aug 2026 |
| Application filed | 20 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Rajjat Sharma |
| Land area | 12 acres (4.9 ha) |
| Project cost | ₹2.8 crore |
| Village / locality | Mairakalan |
| Taluk / tehsil | Pathankot |
| District | Pathankot |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-01351 |
In context
109 applications in Pathankot since January 2022 are in the same category (Mining): 55 approved, 42 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 31 days from filing to approval. At 12 acres, this one is larger than 58% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 46.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 51 mining leases have applied within 5 km.
Where it is
Mairakalan, Pathankot, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining of minor mineral i.e. RBM from the bed of river Ravi — environmental approval granted, 300 m away
- Mining of minor mineral i.e. RBM from the bed of river Ravi — cleared for impact study, 300 m away
- Proposed Minor Mineral (RBM) Mining Project for obtaining Terms of references,… — under environmental review, 500 m away
- Mining of minor mineral i.e.RBM from the bed of river Ravi — withdrawn, 600 m away
- River bed Mining project — environmental approval granted, 600 m away
- CRMS-197 site at village Maira Kalan,Pathankot by M/s Kiran Stone Crusher — under environmental review, 850 m away
- Obtaining Term of Reference of Environmental Clearance of the area Minor… — environmental approval granted, 950 m away
- Obtaining Term of Reference of Environmental Clearance of the area Minor… — cleared for impact study, 950 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.