Quick answers
What is Reliance BP Mobility Limited?
Reliance BP Mobility Limited is an approved fuel station in Kamalpura, Jagraon, Ludhiana, Punjab. The site covers 0.4 acres.
Who is building it?
The applicant is Reliancebp Mobility Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 25 Jun 2026), as of 27 Nov 2026.
Where is it?
In Kamalpura, Jagraon, Ludhiana, Punjab.
How big is it?
It has a stated cost of ₹1 crore; a site of 0.4 acres and 100 m² of forest land.
When was it filed?
The application was filed on 5 Apr 2026.
Project details
| Official title | Reliance BP Mobility Limited at Village- Kamalpura, on Jagraon To Raikot Road RHS, MDR-51, Near Mile Stone-11, Tehsil- Jagraon, Distt – Ludhiana. |
|---|---|
| Status | Forest land use approved |
| Status since | 25 Jun 2026 |
| Application filed | 5 Apr 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Reliancebp Mobility Limited |
| Land area | 1,600 m² |
| Forest land | 100 m² |
| Project cost | ₹1 crore |
| Village / locality | Kamalpura |
| Taluk / tehsil | Jagraon |
| District | Ludhiana |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-01672 |
In context
32 applications in Ludhiana since January 2022 are in the same category (Fuel stations): 22 approved, 3 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 0.4 acres, this one is smaller than 72% of them.
Where it is
Kamalpura, Jagraon, Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- The Grand Mansion Wedding Resort — more information requested, 5.2 km away
- High Level Bridge Single Span over Abohar Branch Canal crossing Jagraon –… — more information requested, 5.3 km away
- High level Bridge Single Span Over Abohar branch Canal Crossing Jagraon Raikot… — lapsed, 5.3 km away
- Pal Filling Station — lapsed, 9 km away
- Expansion in existing unit namely "M/s Vivachem Intermediates (P) Limited"… — initial checks, 9.8 km away
- Expansion in existing unit namely "M/s Vivachem Intermediates (P) Limited"… — cleared for impact study, 9.8 km away
- Proposed manufacturing unit for production of Formaldehyde and Resin by M/s… — under environmental review, 9.9 km away
- Proposed Resin & Glue manufacturing plant of capacity 100 TPD by M/s Sterling… — environmental approval granted, 10.1 km away
All 19 Reliancebp Mobility projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.