Quick answers
What is this project?
High Level Bridge Single Span over Abohar Branch Canal crossing Jagraon – Raikot Road is a proposed road project in Akhara (142), Jagraon, Ludhiana, Punjab. The site covers 0.5 acres.
Who is building it?
The applicant is Executive Engineer Division No I.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Akhara (142), Jagraon, Ludhiana, Punjab.
How big is it?
It has a stated cost of ₹6.6 crore; a site of 0.5 acres and 1,910 m² of forest land.
When was it filed?
The application was filed on 23 Jun 2025.
Project details
| Official title | High Level Bridge Single Span over Abohar Branch Canal crossing Jagraon – Raikot Road at village Akhara, Tehsil Jagraon Distt. Ludhiana |
|---|---|
| Status | More information requested |
| Status since | 28 Nov 2025 |
| Application filed | 23 Jun 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer Division No I |
| Land area | 1,900 m² |
| Forest land | 1,910 m² |
| Project cost | ₹6.6 crore |
| Village / locality | Akhara (142) |
| Taluk / tehsil | Jagraon |
| District | Ludhiana |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-03387 |
In context
140 applications in Ludhiana since January 2022 are in the same category (Roads & highways): 44 approved, 52 filed or under review, and 44 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 0.5 acres, this one is smaller than 94% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Akhara (142), Jagraon, Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- High level Bridge Single Span Over Abohar branch Canal Crossing Jagraon Raikot… — lapsed, 0 m away
- Pal Filling Station — lapsed, 3.8 km away
- Road project by M/S Elysian Infra — lapsed, 5.2 km away
- Project by M/S Elysian Infra — under forest review, 5.2 km away
- Project by M/S Elysian Infra — forest land use approved, 5.2 km away
- Reliance BP Mobility Limited — forest land use approved, 5.3 km away
- Road project by M/S Crystal Grand Palace (Existing Sartaj Marriage Palace), in… — lapsed, 6.1 km away
- Approach road for Proposed site of PUDA/GLADA OUVGL Scheme (Old Co Operative… — more information requested, 7.7 km away
More from Executive Engineer Division No I in Ludhiana
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.