Quick answers
What is this project?
Permission for construction of approach Access Retail Outlet of Bharat Ecofuels Private Limited is a lapsed fuel station in Dakala, Patiala, Punjab. The site covers 0.3 acres.
Who is building it?
The applicant is Bharat Ecofuels Private Limited.
Has it been approved?
No. The application was lapsed on 4 Dec 2025, so it is no longer under consideration.
Where is it?
In Dakala, Patiala, Punjab.
How big is it?
It has a stated cost of ₹1 crore; a site of 0.3 acres and 120 m² of forest land.
When was it filed?
The application was filed on 28 Oct 2025.
Project details
| Official title | Permission for construction of approach Access Retail Outlet of Bharat Ecofuels Private Limited at Vill: Dakala Tehsil & Distt: Patiala. |
|---|---|
| Status | Lapsed |
| Status since | 4 Dec 2025 |
| Application filed | 28 Oct 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Bharat Ecofuels Private Limited |
| Land area | 1,300 m² |
| Forest land | 120 m² |
| Project cost | ₹1 crore |
| Village / locality | Dakala |
| Taluk / tehsil | Patiala |
| District | Patiala |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-01799 |
In context
37 applications in Patiala since January 2022 are in the same category (Fuel stations): 27 approved, 3 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 0.3 acres, this one is smaller than 81% of them.
Where it is
Dakala, Patiala, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying the Ofc on Various Routes As Per Drawing in Dist. Patiala — lapsed, 5.1 km away
- Permission for construction of approach Access to Hospital Building namely… — more information requested, 5.9 km away
- Fuel station by M/S Reliance Bp Mobility Limited — lapsed, 6.8 km away
- Fuel station by M/S Reliance Bp Mobility Limited Filling Station — lapsed, 6.8 km away
- Diversion of 0.0622 ha of forest land permission for construction of approach… — lapsed, 6.8 km away
- Maa Sheetla Filling Station — forest land use approved, 6.8 km away
- Permission for construction of approach Access to Proposed Hotel Building By… — forest land use approved, 8.1 km away
- Permission for construction of Approach Access to M/S HANSTECH SEEDS PRIVATE… — forest land use approved, 8.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.