Quick answers
What is this project?
Diversion of forest land for access to Proposed Retail Outlet of HPCL is an approved fuel station in Nihalgarh, Dharamkot, Moga, Punjab. The site covers 0.7 acres.
Who is building it?
The applicant is H.P.C.L Bathinda.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 13 Feb 2026), as of 27 Nov 2026.
Where is it?
In Nihalgarh, Dharamkot, Moga, Punjab.
How big is it?
It has a stated cost of ₹50 lakh; a site of 0.7 acres and 860 m² of forest land.
When was it filed?
The application was filed on 29 May 2025.
Project details
| Official title | Diversion of forest land for access to Proposed Retail Outlet of HPCL at Village Nihalgarh, On Kot Ise Khan-Makhu Road NH-703B In tehsil Dharamkot Distt. Moga, |
|---|---|
| Status | Forest land use approved |
| Status since | 13 Feb 2026 |
| Application filed | 29 May 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | H.P.C.L Bathinda |
| Land area | 2,700 m² |
| Forest land | 860 m² |
| Project cost | ₹50 lakh |
| Village / locality | Nihalgarh |
| Taluk / tehsil | Dharamkot |
| District | Moga |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-02091 |
In context
17 applications in Moga since January 2022 are in the same category (Fuel stations): 12 approved, 2 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 0.7 acres, this one is smaller than 59% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nihalgarh, Dharamkot, Moga, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Approach road for Existing/proposed Retail outlet named "M/s Narang Fuel Centre" — lapsed, 3.8 km away
- Bajeke Sand Mining Project, Executive Engineer/Ferozepur, Drainage-Cum-Mining… — environmental approval granted, 7.2 km away
- Bajeke Sand Mining Project, Executive Engineer/Ferozepur, Drainage-Cum-Mining… — cleared for impact study, 7.2 km away
- Approach Access road to retail outlet of Bharat Petroleum Corp Ltd — forest land use approved, 8.6 km away
- Kaila Sand Mining Project, Executive Engineer/Ferozepur, Drainage-Cum-Mining &… — more information requested, 10.9 km away
- Diversion of forest land for access to Proposed Commercial/ Residential… — more information requested, 11 km away
- Mehruwala Sand Mining Project, Executive Engineer/Ferozepur,… — environmental approval granted, 11.3 km away
- Estimate for Desilting in Longitudinal Length Opp. Ismailpur Complex ,rd… — lapsed, 12.2 km away
More from H.P.C.L Bathinda in Moga
- Diversion of 0.0866 ha. forest land for approach access to proposed retail… — more information requested
- Diversion of 0.0866 ha. forest land for approach access to proposed retail… — lapsed
- Approach Access road to retail outlet of Hindustan Petroleum Corp Ltd — forest land use approved
- Diversion of forest land for access to Proposed Retail Outlet of HPCL — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.