Quick answers
What is this project?
Underground Pipeline for the Purpose of Irrigation From S.T.P. Ablowal, Patiala is an approved pipeline project in Abbalwal, Patiala, Punjab. The site covers 0.5 acres.
Who is building it?
The applicant is Rural Development.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 16 Jan 2025), as of 27 Nov 2026.
Where is it?
In Abbalwal, Patiala, Punjab.
How big is it?
It has a stated cost of ₹5.2 crore; a site of 0.5 acres and 2,130 m² of forest land.
When was it filed?
The application was filed on 24 Apr 2024.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 16 Jan 2025 |
| Application filed | 24 Apr 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Rural Development |
| Land area | 2,100 m² |
| Forest land | 2,130 m² |
| Project cost | ₹5.2 crore |
| Village / locality | Abbalwal |
| Taluk / tehsil | Patiala |
| District | Patiala |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-02161 |
In context
12 applications in Patiala since January 2022 are in the same category (Pipelines): 4 approved, 5 filed or under review, and 3 withdrawn, lapsed or rejected. At 0.5 acres, this one is smaller than 55% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Abbalwal, Patiala, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Permission for Laying 24x7 Drinking Water Supply in Patiala City along Bhakhra… — forest land use approved, 200 m away
- Permission for construction of approach Access to BISHAN RESORT (Sidhu… — lapsed, 550 m away
- Permission for construction of approach Access to Proposed Hotel Building of… — forest land use approved, 600 m away
- DiversionPermission for construction of approach Access to Proposed M.R… — forest land use approved, 1000 m away
- Expansion of Educational Institute namely "Thapar Institute of Engineering and… — cleared for impact study, 1.5 km away
- Expansion of Educational Institute namely "Thapar Institute of Engineering and… — environmental approval granted, 1.6 km away
- Permission for construction of approach Access to Commercial Project Namely "… — lapsed, 2 km away
- Permission for construction of approach Access to "T.C Food & Hospitality… — forest land use approved, 3 km away
More from Rural Development in Patiala
- Upgradation of 44 Mtr. Single Span Steel Bridge on BML at RD 70 of Patiala –… — forest land use approved
- Approach access to Fish Market — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.