Quick answers
What is this project?
Permission for Laying 24x7 Drinking Water Supply in Patiala City along Bhakhra Main Line (B.M.L) RD 254-255 L/s and Model Town Drain RD B.M.L 251 to Patiala Navigation Channel (P.N.C) Bridge L/s under Forest division Patiala is an approved pipeline project in Patiala, Punjab. The site covers 0.2 acres.
Who is building it?
The applicant is Punjab Water Supply and Sewerage Divsion No.1 Patiala..
Has it been approved?
Yes. Its status is “Forest land use approved” (since 16 Jul 2024), as of 27 Nov 2026.
Where is it?
In Patiala, Punjab.
How big is it?
It has a stated cost of ₹1 crore; a site of 0.2 acres and 910 m² of forest land.
When was it filed?
The application was filed on 7 Aug 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 16 Jul 2024 |
| Application filed | 7 Aug 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Punjab Water Supply and Sewerage Divsion No.1 Patiala. |
| Land area | 900 m² |
| Forest land | 910 m² |
| Project cost | ₹1 crore |
| Village / locality | Patiala |
| Taluk / tehsil | Patiala |
| District | Patiala |
| State | Punjab |
| Location from | Site area on record |
| Our reference | WID-PB-02057 |
In context
12 applications in Patiala since January 2022 are in the same category (Pipelines): 4 approved, 5 filed or under review, and 3 withdrawn, lapsed or rejected. At 0.2 acres, this one is smaller than 73% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Patiala, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Underground Pipeline for the Purpose of Irrigation From S.T.P. Ablowal, Patiala — forest land use approved, 200 m away
- Permission for construction of approach Access to BISHAN RESORT (Sidhu… — lapsed, 350 m away
- Permission for construction of approach Access to Proposed Hotel Building of… — forest land use approved, 400 m away
- DiversionPermission for construction of approach Access to Proposed M.R… — forest land use approved, 850 m away
- Expansion of Educational Institute namely "Thapar Institute of Engineering and… — cleared for impact study, 1.7 km away
- Expansion of Educational Institute namely "Thapar Institute of Engineering and… — environmental approval granted, 1.7 km away
- Permission for construction of approach Access to Commercial Project Namely "… — lapsed, 1.9 km away
- Permission for construction of approach Access to "T.C Food & Hospitality… — forest land use approved, 3 km away
More from Punjab Water Supply and Sewerage Divsion No.1 Patiala. in Patiala
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.