Quick answers
What is this project?
Clearance of silted material between RD 1000-11760 of 4L bandh of River Satluj of Seed Farm-1 Complex Distt. Ludhiana is a lapsed project in Alluwal, Ludhiana (West), Ludhiana, Punjab. The site covers 51.4 acres.
Who is building it?
The applicant is Executive Engineer Cum District Mining Officer Ludhiana.
Has it been approved?
No. The application was lapsed on 13 Mar 2026, so it is no longer under consideration.
Where is it?
In Alluwal, Ludhiana (West), Ludhiana, Punjab.
How big is it?
It has a site of 51.4 acres and 39.8 acres (16.1 ha) of forest land.
When was it filed?
The application was filed on 12 Dec 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 13 Mar 2026 |
| Application filed | 12 Dec 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Executive Engineer Cum District Mining Officer Ludhiana |
| Land area | 51.4 acres (20.8 ha) |
| Forest land | 39.8 acres (16.1 ha) |
| Village / locality | Alluwal |
| Taluk / tehsil | Ludhiana (West) |
| District | Ludhiana |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-02292 |
In context
22 applications in Ludhiana since January 2022 are in the same category (Other): 7 approved, 1 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 51.4 acres, this one is larger than 82% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Alluwal, Ludhiana (West), Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Desilting of River Sutlej in between RD 1000-11760 of 4-L Bandh of River… — lapsed, 50 m away
- Desilting of River Sutlej in between RD 1000-11760 of 4-L Bandh of River… — lapsed, 100 m away
- Proposed Sand Mining (boulder, gravel, sand) project as per approved DSR No.… — environmental approval granted, 2.5 km away
- Minor Mineral (Sand) Mining Project for obtaining Terms of Reference (ToR) of… — environmental approval granted, 2.5 km away
- Minor Mineral (Sand) Mining Project for obtaining Terms of Reference (ToR) of… — under environmental review, 2.5 km away
- Jansukh — cleared for impact study, 3.1 km away
- Road project by M/s Richville Infra Pvt. Ltd. Village Kaddian, Tehsil & Distt.… — more information requested, 3.2 km away
- Approach road to M/s Richville Infra Pvt. Ltd Through Mr. Rajdeep Singh… — lapsed, 3.2 km away
More from Executive Engineer Cum District Mining Officer Ludhiana in Ludhiana
- Proposed Sand Mining (boulder, gravel, sand) project as per approved DSR No.… — environmental approval granted
- Project for Constructing Surface Pumps for Lifting Water From Sirhind Canal Rd… — lapsed
- Desilting of River Sutlej in between RD 1000-11760 of 4-L Bandh of River… — lapsed
- Desilting of River Sutlej by Abadies and Agricultural Land — not approved
- Desilting of River Sutlej in between RD 38730-40980 of 4-L Bandh of River… — lapsed
- Clearance of silted material between RD 202000-208000 of 3L Bandh River Sutlej… — lapsed
40 Executive Engineer Cum District Mining Officer Ludhiana, Punjab projects in Ludhiana
All 43 Executive Engineer Cum District Mining Officer Ludhiana, Punjab projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.