Project details
| Official title | Diversion of 0.9597 Hac. Forest Land Permission for Cutting Nos. of 55 Tress Falls in Wtp Talwara Plot (Size 131.44 Mtr X 73.02 Mtr = 9597.748 Sqmt) Project for Supply of Surface Water to Meet Drinking Water Needs in 197 Villages of Hoshiarpur District in Punjab State Under Forest Division, Dasuya |
|---|---|
| Status | Lapsed |
| Status since | 18 Jul 2023 |
| Application filed | 29 Jan 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Department of Water Supply and Sanitation Punjab |
| Land area | 2.4 acres (1 ha) |
| Forest land | 2.4 acres (1 ha) |
| Project cost | ₹96 lakh |
| Village / locality | Talwara |
| Taluk / tehsil | Mukerian |
| District | Hoshiarpur |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-02462 |
In context
21 applications in Hoshiarpur since January 2022 are in the same category (Water & irrigation): 12 approved, 0 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 2.4 acres, this one is smaller than 100% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Talwara, Mukerian, Hoshiarpur, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.9598 Hac. Forest Land Permission for Cutting Nos. of 55 Tress… — forest land use approved, 0 m away
- Diversion of 0.9598 Hac. Forest Land Permission for Cutting Nos. of 55 Tress… — approval revoked, 0 m away
- Desilting of Restoring water capacity by clearing Syphon Aqueduct at RD ± 200… — lapsed, 300 m away
- Northern Railway for the construction of Railway line from village Bhambotar… — forest land use approved, 2.5 km away
- Execution of of 18 MW Ground Mounted Solar Power Project — lapsed, 3.5 km away
- BSNL Mobile tower under 4G Saturation Project — lapsed, 3.5 km away
- Diversion Area of 0.4419 Hect. Delisted Area =0.4147 Hect.+Under Section PLPA… — lapsed, 5.8 km away
- New Bsnl Mobile Tower — forest land use approved, 5.8 km away
More from Department of Water Supply and Sanitation Punjab in Hoshiarpur
- Diversion of 0.9598 Hac. Forest Land Permission for Cutting Nos. of 55 Tress… — forest land use approved
- Diversion of 2.820 Hac. Forest Land Permission for Laying Water Pipeline… — forest land use approved
- Diversion of 7.4111 Hac. Forest Land Permission for Laying Water Pipeline… — lapsed
- Diversion of 2.856 Hac. Forest Land Permission for Laying Water Pipeline… — lapsed
- Diversion of 0.9598 Hac. Forest Land Permission for Cutting Nos. of 55 Tress… — approval revoked
6 Department of Water Supply and Sanitation Punjab projects in Hoshiarpur
All 7 Department of Water Supply and Sanitation Punjab projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.