Project details
| Status | Lapsed |
|---|---|
| Status since | 30 Jul 2026 |
| Application filed | 18 Jun 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Executive Engineer Drainage Cum District Mining Officer Hoshiarpur |
| Land area | 6.7 acres (2.7 ha) |
| Forest land | 6.7 acres (2.7 ha) |
| Project cost | ₹2.3 crore |
| Village / locality | Talwara |
| Taluk / tehsil | Mukerian |
| District | Hoshiarpur |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-02776 |
In context
14 applications in Hoshiarpur since January 2022 are in the same category (Other): 4 approved, 1 filed or under review, and 9 withdrawn, lapsed or rejected. At 6.7 acres, this one is larger than 93% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Talwara, Mukerian, Hoshiarpur, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.9598 Hac. Forest Land Permission for Cutting Nos. of 55 Tress… — forest land use approved, 300 m away
- Diversion of 0.9598 Hac. Forest Land Permission for Cutting Nos. of 55 Tress… — approval revoked, 300 m away
- Diversion of 0.9597 Hac. Forest Land Permission for Cutting Nos. of 55 Tress… — lapsed, 300 m away
- Northern Railway for the construction of Railway line from village Bhambotar… — forest land use approved, 2.8 km away
- Execution of of 18 MW Ground Mounted Solar Power Project — lapsed, 3.6 km away
- BSNL Mobile tower under 4G Saturation Project — lapsed, 3.8 km away
- Diversion Area of 0.4419 Hect. Delisted Area =0.4147 Hect.+Under Section PLPA… — lapsed, 6 km away
- New Bsnl Mobile Tower — forest land use approved, 6.1 km away
More from Executive Engineer Drainage Cum District Mining Officer Hoshiarpur in Hoshiarpur
- Desilting of Beas River — under wildlife review
- Desilting of Beas River — under wildlife review
- Desilting of Beas River — more information requested
- Desilting of Beas River — more information requested
- Desilting of Beas River — more information requested
- Desilting of Beas River — more information requested
22 Executive Engineer Drainage Cum District Mining Officer Hoshiarpur, Punjab projects in Hoshiarpur
All 24 Executive Engineer Drainage Cum District Mining Officer Hoshiarpur, Punjab projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.