Quick answers
What is this project?
This approved road project by M/S Ginni Food Products, at Village Jassar, Tehsil Ludhiana West, Distt. Ludhiana is in Jassar, Ludhiana (East), Ludhiana, Punjab. The site covers 2 acres.
Who is building it?
The applicant is Harminder Singh.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 29 Apr 2026), as of 27 Nov 2026.
Where is it?
In Jassar, Ludhiana (East), Ludhiana, Punjab.
How big is it?
It has a stated cost of ₹3.5 crore; a site of 2 acres and 150 m² of forest land.
When was it filed?
The application was filed on 2 Oct 2024.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 29 Apr 2026 |
| Application filed | 2 Oct 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Harminder Singh |
| Land area | 2 acres (0.8 ha) |
| Forest land | 150 m² |
| Project cost | ₹3.5 crore |
| Village / locality | Jassar |
| Taluk / tehsil | Ludhiana (East) |
| District | Ludhiana |
| State | Punjab |
| Location from | Site area on record |
| Our reference | WID-PB-02590 |
In context
140 applications in Ludhiana since January 2022 are in the same category (Roads & highways): 44 approved, 52 filed or under review, and 44 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 2 acres, this one is smaller than 64% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jassar, Ludhiana (East), Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "M/S Fastway Global Private Limited" — initial checks, 2.8 km away
- Manufacturing of Bicycle and Cycle Components — initial checks, 2.8 km away
- Diversion of 4.4070 Ha. of Forest Land for laying transmission Pipelines while… — lapsed, 3.3 km away
- High Level Bridge over Abohar Branch Canal near village Khanpur, District… — forest land use approved, 3.3 km away
- Expansion in the existing Steel Manufacturing unit M/s Timexo Metals Pvt. Ltd.… — cleared for impact study, 3.4 km away
- Industrial project by M/s Vee Kay Concast Pvt Ltd. — lapsed, 3.6 km away
- Expansion in existing Environmental Clearance of Integrated Commercial and… — lapsed, 4.1 km away
- Proposed New Steel manufacturing unit having capacity 2,20,500 TPA of Steel… — lapsed, 4.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.